ML20004F067
| ML20004F067 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 06/10/1981 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | Clayton F NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA) |
| Shared Package | |
| ML20004F068 | List: |
| References | |
| NUDOCS 8106160462 | |
| Download: ML20004F067 (1) | |
Text
Mailing Address Alabama P wer Company
- 600 North 18th Street Post Offica Box 2641 Darmingham. Alaoima 35291 Telephone 205 733-6081 F. L Clayton, Jr.
M,b
~
274;;;;;lfl"'
AlabamaPower thesoumem e'ec:ncsnem June 10, 1981 e.
Docket No. 50-348 S' Nh J 6 L 1 h
0)
Director, Office of Management Ei JUN 151981 > 3 Information and Program Control t-U. S. Nuclear Regulatory Commission
%.u.s. g g y m 7 Washington, D.C.
20555
, J/
Dear Sir:
RE: Joseph M. Farley Nuclear Plant Unit No. 1 Monthly Operating Data Report Attached are two (2) copies of the Hay, 1981 monthly operating report for Joseph M. Farley Nuclear Plant, Unit 1, as required by Section 6.9.1.6 of the Appendix A Technical Specifications. As requested by letter from Mr.
John F. Stolz to Mr. Alan R. Barton, dated Cetober 21, 1977, a " Narrative Summary of Operating Experience" is included in the attached report.
If you have any questions, please advise.
Yours very truly, f$n >
F.L.Clayton,[Jr.
FLCJr/JRC:nac Attachments l
xc:
Mr. Ted Cintula (1 copy) 6 10 copies)
Director, RII (1 copy) i ws s
/[
810616n{UQ\\
lh 1
-....