Notice of Violation from Insp on 810401-30
ML20004F101
Person / Time
Site: Pilgrim
Issue date: 06/02/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
Shared Package
ML20004F095 List:
References
50-293-81-08, 50-293-81-8, NUDOCS 8106160503
Download: ML20004F101 (3)


Text

"

APPENDIX A NOTICE OF VIOLATION Boston Edison Company Docket No. 50-293 Pilgrim Nuclear Power Station License No. OPR-35 As a result of the inspection conducted on April 1-30,1981, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7,1980), the following violations were identified.

A.

Technical Specification 6.8.A requires that " procedures be established, implemented and maintained that meet or exceed the requirements and re-comendations of Sections 5.1, 5.3 of ANSI N18.7-1972...". Section 5.1.5 of ANSI N18.7-1972 requires the use of procedures for equipment control and tagging.

Station Procedure No.1.4.5 "PNPS Tagging Procedure", Revision 8,Section III.8, requires that protective tags be attached securely to controls..., that if the tag could become illegible it should be inserted in a transparent holder, and that red tags placed on equipment without an accompanying maintenance request must be logged in the Red Tag 1.og.

Contrary to the aboves between April 16, 1981 and April 27, 1981, the l

foll.owing conditions existed:

Two red tags attached to the CARD 0X tank fill valves in the turbine building were not logged in the Red Tag Log.

- A red tag attached to the outlet valve in the nitrogen supply line to the TIP room downstream of meter FQ5028 in the reactor building was not logged in the Red Tag Log.

Two tags attached to the Auxiliary Heating Boilers were illegible

.and covered with paint; and one was attached to the light bulb and not the appropriate control switch.

A red tag attached to a service air outlet connection isolation

, valve in the west end of the Radwaste Corridor was not logged in the Red Tag Log and had not been properly authorized.

Two red tags attached to fittings (for a 3/8 inch air hose connect-ing the non essential instrument air to the service air for the flat bed filter seals) in the Radwaste Corridor were not logged in the Red Tag Log.

This is a Severity Level VI Violation (Supplement I).

810616060R y

-,+ - -

+m.ryaw a

-g e-e-ai.ei-e,say-,e.,

ie-,,,-.--,---%,

-..c-e--4.--,,.4-,

--e.,7 se-m wee - ee eem=--

    • -w-*=-w--N

---'-re-e----*

- - *e-=r

Appendix A 2

B.

Technical Specification 6.8.A requires that " procedures be established, implemented, and maintained that meet or exceed the

.;uirements and re-comendations of Sections 5.1 and 5.3 of ANSI N18.7-1972". Sections 5.3.3 and 5.3.4.1 of ANSI 18.7-1972 require the use of procedures for system operation and plant startup including the confimation of valve and instrument lineups.

Station Procedure No. 2.1.11 " Current Valve Lineup File", Revision 0,Section IV, requires that a complete new valve lineup be made following each extended shutdown, and that these lineup sheets be signed as indi-cated thereon, and returned to the control room for filing in the Current Valve Lineup File.

Contrary to the above, on April 20,1981, the current system lineup January-May,1980 refueling outage) prior to startup from the check sheets (which were perfomed on file for the following systems i

had not been signed by the Watch Engineer indicating his review and acceptance prior to system operation:

Procedure Number System Appendix Not Signed 2.2.21 9PCI A and B 2.2.23 ADS A

2.2.77 Drywell Leak I.

Detection A

i 2.2.32 Service Water A

2.2.22 RCIC A

l l

In addition, the completed system valve lireup check sheets for the l

Low Pressure Coolant Injection (LPCI) an'd the Drywell Leak Detection System identified valves out of the nomal position with no explanation l

I or reason provided.

This is a severity level VI violation (Supplement I).

C.

10 CFR 50.59 (b) states in part that "the licensee shall maintain re-cords of changes in the facility... to the extent that such changes constitute changes in the facility as described in the safety analysis These records shall include a written safety evaluation report...

which provides the basis for the determination that the change... does l

not involve an unreviewed safety question."

.g.-e-u~

--,-i-p, s-i.

-mgr.-qye-,*.--rc+--M--**--wp-w4myw%3

+m w---+Mem w y-a m97-ws--W 9 -e

-'*w---*-

m

-1 m-+-

y-

-i.e w

=-e.,-e-.

.gm

-.,ey-,%

y

-emyye

Appendix A 3

Contrary to the above, on April 27, 1981, modifications had been made to the Instrument Air and Service Air Systems as described in the FSAR Section 10.11.3, and FSAR Figure 10.11-1 (Instrument Air and Service Air P&ID), without a safety evaluation having been perforreo.

This is a severity level IV violation (Supplement I).

Pursuant to the provisions of 10 CFR 2.201, Boston Edison Company is hereby required to submit to this office within twenty-five days of the date of corrective steps which have been taken and the results achieved (g (1) the this Notice a written statement or explanation in reply, includinfor Items A and C); (2) corrective steps which will be taken to avoid further viola-tions (for Items A, B, and C); and (3) the date when full compliance will be achieved (for Items A, B, and C). Under the authority of Section 182 of'the Atomic Energy Act of 1954, as amended, this response shall be sub-mitted under oath or affimation.

i l

s Dr.ted Eldon C. Brunner, Chief Projects Branch No. 1, Division of Resident t

and Project Inspection l

.. ~

....