ML20006A350

From kanterella
Revision as of 07:22, 23 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of 900131 Meeting w/C-E Owners Group in Rockville,Md to Provide Interface for NRR Mgt & Lead Technical Reviewers W/Licensee Counterparts in Order to Review Status of Safety & Technical Issues
ML20006A350
Person / Time
Issue date: 01/17/1990
From: Partlow J
Office of Nuclear Reactor Regulation
To: Miraglia F, Murley T, Sniezek J
NRC
References
NUDOCS 9001260155
Download: ML20006A350 (5)


Text

g l

4 ' 4[" N,6 UNITED STATES

-8 7.

NUCLEAR REGULATORY COMMISSION 1

g j

WASHINGTON, D. C. 20655 Ok....,o#

January 17,-1990 j

y I

v MEMORANDUM FOR:

T. Murley J. Zwolinski J. Sniezek W. Travers F. Miraglia J. Roe

[

S.'Varga J. Richardson

- G. Holahan A. Thadani

- B. Boger F. Gillespie W.-Hehl l

FROM:

James G. Partlow Associate Director for Projects

~ 0ffice of Nuclear Reactor Regulation

SUBJECT:

FORTHCOMING MEETING WITH COMBUSTION ENGINEERING OWNERS GRCUP DATE & TIME:

January 31, 1990 9:00 AM - 12:00 PM LOCATION:

One White Flint North 11555 Rockville Pike Room 6/B/11 Rockville, Maryland l'

PURPOSE:

To provide an interface for NRR Management and lead technical reviewers with their C-E Owners Group (CEOG) counterparts in order to review the status of important safety and technical issues which require NRC technical review.

l' AGENDA:

See tentative agenda enclosed.

\\g

.f h

9001260155.900117 y"7"""""" Esc-NP4 RLE CENTEll COPY g

g g

-,n s-e,--:,----

m m

^

{o l ; ".,

' Multiple Addressees 2-January 17, 1990 i

Participants:

NRC CEOG

]

J. Partlow-E. Sterling, et, al.

S. Yarga n

B. Boger J. Richardson A. Thadani S. Sun S. L. Wu S. Lee B. Elliot Y. H. Hsii A. Mendiola S. Rhow ORIGINAL SIGNED BY:

' James G. Partlo'w i

Associate Director for Projects Office of Nuclear Reactor Regulation l

Enclosure:

Tentative Agenda i

cc: Mr. Edward Sterling, Chairman I

Combustion Engineering Owners Group c/o Arizona Public Service Company P. O. Box 52034 Phoenix, AZ 85072 2034 Mr. Jim Pfiefer Combustion Engineering, Inc.

1000 Prospect Hill Road Windsor, CT 06095 0500 Mr. Charles Brinkman Combustion Engineering, Inc.

12300 Twinbrook Parkway Suite 330 Rockville, MD 20852 i

l

  • Meetings between NRC technical staff and applicants or licensees are l

open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement l

of NRC Staff-Policy, 43 Federal Register 28058,6/28/78.

L I's l~OFC :DRP:ADRI:TA :DRP:.

/

DRP:

V

ADP

\\

g a [._ : _ _ _.4.t g:JGPartlok f

I NAME :A i

ah B i er
SA i -....:..........:...........:....._..,..__:____........:..._____....:.....__.....:......___

DATE : ////90

01/l1/90
01/l]/90
01/ /90 OFFICIAL RECORD COPY Document Name:

CE0G MEETING

p

,c DISTRIBUTION ggggpyggp NRC PDR~

~

AD RI R/Ff J. Partlow:-

A. Mendiola-

' E. Jordan.

B. Grimes

. Receptionist - OWFN NRC Participants ACRS-(10)

GPA/PA V. Wilson L.= Thomas C.'Y. Cheng 1.. Marsh

- G. Bagchi C.- McCracken S. Newberry F. Rosa-R. C. Jones J. Calvo

_um_--,_._______m_.m_.m m-_.------_

--._-mmm_mm-m_.mu-mm-mm_am_m--.-_m___

__mm.__amm_m___.m m

____m.-

_m__.2

_-__-.--m ai__

______u-2.--x-_

__.-.s___-.____.m_.__.__.-_

__-.__.m

s-s.

y, ;,J s.

PROPOSED AGENDA C-E OWNERS GROUP /NRC MEETING-NRC OFFICES / WHITE FLINT ROCKVILLE, MARYLAND JANUARY 31, 1990 9:00 AM OPENING STATEMENTS J.G.Partlow(NRC)

Ed Sterling (APS)

C-E OWNERS GROUP UPDATE Ed Sterling (APS)

ACTIVITY REPORT FROM:

Analysis Subcommittee JoeWilliams(BG&E)

SBLOCA Margin Improvement Program j

Alternate LTOP Transient Limit RCS/MSL Leak-Before-Break Justification Surge Line Thermal Fatigue Analyses R.G.1.154 PTS Analyses Operations Subcommittee JohnLohr(BG&E)

Rev 03 of Emergency Procedure Guidelines j

Scram Reduction Program Tech Spec & Licensing Subcommittee CharlesDeDeaux(LP&L)

{

Tech Spec Restructuring Severe Accident Working Group Jerry Holman (LP&L) 1 CE0G Severe Accident Program i

Reliability & Availability Subcommittee Gary Waldrep (APS) t Core Protection Calculator Surveillance Frequent Evaluation Post Accident Sampling System Requirements Evaluation 120 Day RPS/ESFAS Surveillance Test Intervals

~

Materials & Chemistry Subcommittee AlanSmith(AP&L)

Steam Generator Chemical Cleaning Cobalt Reduction in Valves Zinc Injection Reactor Pressure Vessel Embrittlement Program RCS Decon

K

.... i. i

.4

.o

-2

' ACTIVITY REPORTS FROM:

(Contiaued)

Inconel-600 Penetrations Working Group JoeMoaba(FP&L)

Pressurizer Heater Sleeves Pressurizer Instrument Nozzles Other Inconel-600 Penetrations Configuration Management Task Force JeffHologa(LP&L) l Document Assembly and Indexing Program i

NRC INPUT TO THE C-E OWNERS GROUP FINAL COMMENTS J.G.Partlow(NRC)

EdSterling(APS) 12:00 PM ADJOURN I

l s

s i