ML20006B422

From kanterella
Revision as of 06:45, 23 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of Contract Execution,Mod 1,to Validation Studies for Assessing Unsaturated Flow & Transport Through Fractured Rock. Contractor:Univ of Arizona
ML20006B422
Person / Time
Issue date: 12/21/1989
From: Demarco D
NRC OFFICE OF ADMINISTRATION (ADM)
To: Thomas Nicholson, Shao L
NRC, NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
Shared Package
ML20006B423 List:
References
CON-FIN-L-12820, CON-NRC-04-90-051, CON-NRC-4-90-51 NUDOCS 9002020151
Download: ML20006B422 (1)


Text

NRC-04-90-051

..y Olvi$loN OF CONTRACTS MOotFIC Af ton NUM9E R US. NUCLEAR REGULATORY CCMMIS51oN One (1)

WASHINGTON, D.C. MM O NEW O MOoIFICATION -

)

OTHE R iSorconvl l

NOTIFICATION OF CONTRACT EXECUTION CONT A ACT BASEo ON-l l

Lawrence Shao, Director 70.

^"'""'#^**'*"

< r.<i,I Division of Engineering 1

RFPA NO. RES-90-051 Office of Nuclear Reaulatory Research-oATE 1-cove.retseno M

7/17/89 as revised 10/13/89

? 5S"ah@Oel*ftree CoNTR ACT OH ANGES PE R THIS ACTION x

o_e -

.y FROM:

V

~LA'antract Soermonte IDetet Definitization of Letter Contract No. NRC-04-90-051 Contrac: Negotiation Branch No. 2 Olvis10n Of Contract.s anc Procerty Management CoNTR ACTOR INanw e.ocareens.

EXECUTICN oATE University of Arizona ATTN: Mr. Peter Mather NRC 12/7/89; Contractor !2/21/891 Engireering Experiment Station TvPE os c:NTRACT-College of Engineering and Mines Civil Engineering Building No. 72, Room 303,. Tucson AZ Cost Reimbursement PROJEC* T:TLE PERioo oF PERFORM ANCE l

" Validation Studies fo.r Assessing Unsaturated Flow and 11/13/89 throuch 11/12/92 l

Transport Through Fractured Rock" PRINCIP AL INVESTIG ATOR Daniel E. Evans NRC AUTHoRIZEo REPRESENT ATIVE Thomas Nicholson esR NUMeER PIN NUMOER AMOUNT 061960010 L12820 NEW NRC FUN 05 S 242,560i00*

FUNDING TOTAL FY FUNOING S

7,d40.00 g-TO rAL NRC OBLIGATIONS S

?.50,000:00 GOV 5MNMENT PROPERTY ATTACHMENTISI:

CONTRACT oOCUMGNT I 3

~

,","M "" "

  • NOTE:

T6e amount on block 12 of Mod. No. 1 shou 3d reflect this amount and e

e co m Cted in M h. 2.

90020201G1 891b1 Q,

PDR CONTR NRC-04-90-051 PDC

\\\\g

_