ML20009F840

From kanterella
Revision as of 08:14, 21 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Ro:On 810610,as Result of Inadvertent Actuation of Fire Protection Deluge Sys on Cooling Tower 2B,levels in Tanks a & B Fell to Approx 235,000 Gallons.Clipper Valve Opened & Deluge Sys Actuated
ML20009F840
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 06/11/1981
From: Hairston W
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II), NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
FNP-81-0728, FNP-81-728, NUDOCS 8108030090
Download: ML20009F840 (1)


Text

r Ol'FICIM. copy l

~.. 'r._ _. j _

Q.1

u..}_... _ _.... '

y

.=-

P. O. Drawer 470 I

-n~ga Ashford, AL 36312 REGIONAL DIRECTOR June 11, 19f,1 DEPUTY DIRECTOR FNP-81-0728 ASSISTANT TO DIRECTOR DIRECTOR, RRP' Mr. J. P. O'Reilly, Director.

. DIRECTOR, EPOS U. S. Nuclear Regulatory ComissionDIRECTOR, ENF/INV 101 Marietta Street, N.V.

Suite 3100 DIRECTOR, ETI Atlanta, Georgia 30303 P_UBI.lC AFFAIRS OFFICER

Dear Mr. O'Reilly:

This is to confirm the telephone call to Mr. Paul hellogg (NRC) at 1410 on June 11, 1981 by Mr. J. D. Woodard (APCo) in accordance with Unit 1 Technical Speciff cation 3.7.11.1 and Unit 2 Technical Specification 3.7.11.1.

As a result of an inadvertent actuation cf th-fire-protection delug--

f systess on cooling tower 2B, the levels in Fire Protection Tanks A and B fell to approximately 235,000 gallons each at 1600 on 6/10/81. Unit 1 and 2 Technical Specifications require a minimum tank level of 250,000 gallons. The tank levels were returned to minimum acceptable Technical Specifications levels at 1845 on 6/10/81.

The inadvertent actuation resulted during maintenance activities. The swit ch an5-.MM simpj_tei Du-c. iu Li.c i

.e v.uictiiuu 1.ic _.ir.j->z.

.e.

g

== mu~r :-

_ _;+++ q; e -- =. < ~ -- a :--

-_m 4 sse_===

.s.g.w-=-3 Qr.-_.t-,__ g y.

. = n m.s., _. g prevent fin protectie: jing: := --

-.--w 3-

-3 m..

a temporary nats, ~.m However, the nitre in httle cutic;. ;;Ive-for--2B cooling tower dei %e- 'y+'a M

l vn nn.L.99z-K h.2,..nt.;;11, t'~~ &m*' ""~ ~;~~~^ *** * '" e *ys tse actuated.

Further detritrvill-be-provid-rd-in-the followup report.

Sincerely ours, G. Hairston, III Plant Manager Joseph M. Farley Nuclear Plant WGH/1Defc:jpd cc:

H. O. Thrash d

W. C=rr.

jp,r l0 R. D. Hill File

$l Ym."M'"M""'"'*'"""'"**~'~

c

'..... a.,,.nenn.x.1~:,z u n.;,,.e. x,. cec,;, nan,nriMa:

r 8108030090 010611 f

I'DR ADOCK 05000348 SL

~

rte

.