7
'E o
g g
o Fr A
g AUS 241931 Docket No.70-984
(
UEP 0 91981> ;9 "W
.?
I Battelle Pacific Northwest Laboratories P.O. Box 999
- /
f l
Richland, Washington 99352 g
l Attention:
Dr. J. J. Fuquay, Assistant Director for Program Support l
Gentlemen:
l l
Subject:
HRC Inspection at Pacific Northwest Laboratories l
l This refers to a routine safety inspection conducted by W. J. Cooley of l
this office on July 16-17, 1981 of activities authorized by NRC Licdnse No. SNM-942 and to the discussion of our findings held by Mr. Cooley with members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection report. Within these areas, the inspection consisted of l
selective examinations of procedures and representative records. inter-views pith personnel, and observations by the inspector.
No items of noncompliance with NRC requirements were identified within the scope of this inspection, l
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information that you (or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within ten (10) days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven (7) days are available for your review, please notify this office promptly so that a new due date may be established. Consistent with section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the infomation which identifies the document or part sought to be withheld, and which
[f,//
8109100100 810824
/
PDR ADOCK 07000904 C
"">. RV,,4,,
g
""" 4. 000LEYLik..
..TH0 BAS.....
..8 81 8/// /81 8/g /81 om)
Nac row a:s no eo,nacic2 0 OFFICIAL RECORD COPY
-o ~=24
uatte.t ie vac1ric NortnWest LaDoratories ggg g 4 ggg contains a full statement of the basis on which it is claimed that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity the considerations j
listed in 10 CFR 2.790(b)(4).
The infonnation sought to be withheld shall be incorporated as far as possible into a separate pcet of the affidavit.
If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be l
glad to discuss them with you.
Sincerely, Onginal signed b, H E. Rook H. E. Book, Chief Radiological Safety Branch
Enclosure:
~
- IE Inspection Report No. 70-984/81-01 cc w/ enclosure:
E. E. 0scarson, Senior Research Scientist 4
Sent to DMB for DCS Processing Distributed by FV:
LFMB State of WA Engelken (ltr) 4 I
I m
m
[
o UNITED STATES 8
- 'n NUCLEAR REGULATORY COMMISSION 5
E REGION V 8
1990 N. CALIFORNIA BOULEVARD E
o SUITE 202, WALNUT CREEK PLAZA
+,,,,
WALNUT CREEK, CALIFORNIA 94596 AUG 2 41981 Docket No.70-984 Battelle Pacific Northwest Laboratories P.O. Box 999 Richland, Washington 99352 Attention: Dr. J. J. Fuquay, Assistant Director for Program Support Gentlemen:
Subject:
NRC Inspection at Pacific Northwest Laboratories This refers to a routine safety inspection conducted by W. J. Cooley of this office on July 16-17, 1981 of activities authorized by NRC License No. SNM-942 and to the discussion of our findings held by Mr. Cooley with members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection report. Within these areas, the inspection consisted of selective examinatiuns of procedures and reoresentative records, inter-views with personnei, cnd observations by.r.e inspector.
No items of noncompliance with NRC requirements were identified within the scope of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.
If this report contains any information l
that you (or your contractors) believe to be exempt from disclosure' under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by telephone within ten (10) days from the date of this letter of your intention to file a request for withholding; and (b) submit within 25 days from the date of this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven (7) days are available for your review, please notify this office promptly so that a new due date may be established. Consistent with section 2.790(b)(1), any such application must be accompanied by an affidavit executed by the owner of the information which identifies the document or part sought to be withheld, and which l
{
t i
l
-~
AUG 2 41981
'Battelle Pacific Northwest Laboratories contains a full statement of the basis on which it is claimed that the infonnation should be withheld from public disclosure.
This section further requires the statement to address with specificity the considerations listed in 10 CFR 2.790(b)(4).
The information sought to be withheld shall be incorporated as far as possible into a separate part of the affidavit.
If we do not hear from you in this regard within the specified periods noted above, the report will be placed in the Public Document Room.
Should you have any ques 1.0 s.Jncerning this inspection, we will be glad to discuss them wit pu -
Sincerely, dV H. E. Book, Chief Radiological Safety Branch
Enclosure:
IE Inspection Report No. 70-984/81-01 cc w/ enclosure:
E. E. Oscarson, Senior Research Scientist
<