ML20010H664
| ML20010H664 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 09/17/1981 |
| From: | Tedesco R Office of Nuclear Reactor Regulation |
| To: | Check P, Grimes B, Johnston W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8109290047 | |
| Download: ML20010H664 (2) | |
Text
-
lt r ;-
+
q' s-SEP 17 ggy 4
g J
2 Ef181981* H
"* M N Docket No.: 50-382 p
o>
MEMORANDUM FOR:
P. S. Check, Assistant Director for Plant Systems, I
B. K. Grimes, Director, Division of Emergency Preparedness, IE W. V. Johnston, Assistan*, Director for Materials & Qualifications Engineering, DE L. S. Rubenstein, Assistant Director for Core and Containment Systems, DSI J. D. Saltzman, Assistant Director for State & Licensing Relations, OSP
'FROM:
R. L. Tedesco, Assistant Director for Licensing, DL
SUBJECT:
Input to Waterford 3 53ER
.The Waterford 3 SSER is scheduled to be published on September 18; however, there appear - to be ten issues that could be closed out if SSER publication is delayed three weeks. These issues are identified on the attached list as open item numbers:
5, 8,10,11,14(a),15,16,17, 24(e), ard 25. The information needed.to close out these issues is currently in-house.
It is particularly important that financial qualifications be addressed in the first supplement because the hearing date is tied to the issuance of the supplement which contains the financial evaluation.
I would appreciate your cooperation in providing SSER input to DL by September 22, 1981.
Or!ginnt signed by:
Rotert L. Tedesco, Assistant Director for Licensing Division of Licensing DISTRIBUT0N:
' Docket' File 150392 RLTedescc FJMiraglia I-SBlack p
NSIC 8109290047 ago927 TEM jDRADOCK 05000382 LB#3 Files PDR DL:LB#3 A l
DL: 'i[L
'\\
crv,ce >
y a.y esep y _,,,,,,,,,,,
suanAus > S.C,@,1,,a,c,k.;j,b,,,,
,,9,,
} i.a,
,,,,,R,L,,,
........T..[51,.,
9//
... 9ps../81 9/ /81 o4re >
- i me rosu sia tio soj ecu o24o OFFICIAL RECORD COPY usam mi_m.m
- E
'c-WATERFORD 3 STATUS REPORT OPEN ITEMS IN SER-
~~ APPL. RESPONSE DATE STAFF INPUT TO DL
- 1.
Fire Protection 09/18/81 2.
Licensee Qual.
11/30/81 12/31/81 3.
PSI /ISI' 11/15/81 12/31/81
- 4. ' Appendices G&H closed 5.
Emergency' Planning 06/17/81 09/15/81 6.
Environmental Qual.
1 0/01/81 7.
Seismic Qual.
in-house 8.
Steam Voiding in R.V.
in-house 09/15/81 9.. Feedwater line break analysis 09/10/81 10.
Loss of AC-or RCP's during MSLB in-house.
09/15/81
~
- 11. Clarification of transient analyses in-house 09/15/81 12.
RCP. Shaft Break 10/81
.13.
Pressure transient in Shield Bldg.
- 14. Thermal-hydraulit desiga closed (a)_DNBR in-house 09/,15/81 (b) ~CPC Software 03/82 (c).futurecycles 09/15/81
- 15. Site hazards in-house 09/08/81
- 16. Cold Shutdown without leaving CR in-house 09/15/81
-17.
Q-List-in-house 09/15/81 18.
Turbine missiles 10/30 11/81 19.
Emergency Feedwater control closed 20.
IEB 80-06 closed
- 21. Single fai' lure o# control system closed
- 22. ' Organic Materials closed
-23. -Plant Procedures 12/01/81 12/31
- 24. TMI(7)
(a)
I. A. l _
12/01/81 (b)-.I.B.1.2 12/01/81 (c)
I.C.'s.
long term requirement short term / closed (d)
I.D.1 04/82.
05/82 (e)
II.E.4.2 in-house 09/15/81 (f);II.F.2' N/S closed (g)
II.D.3
- 25.
Financial Qualifications 08/31/81 09/15/81