ML20010H664

From kanterella
Revision as of 05:29, 21 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Frowards Status Rept on Open SER Items.Supplemental SER Input Requested by 810922.Importance of Financial Qualifications Stressed
ML20010H664
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/17/1981
From: Tedesco R
Office of Nuclear Reactor Regulation
To: Check P, Grimes B, Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE), Office of Nuclear Reactor Regulation
References
NUDOCS 8109290047
Download: ML20010H664 (2)


Text

-

lt r ;-

+

q' s-SEP 17 ggy 4

g J

2 Ef181981* H

"* M N Docket No.: 50-382 p

o>

MEMORANDUM FOR:

P. S. Check, Assistant Director for Plant Systems, I

B. K. Grimes, Director, Division of Emergency Preparedness, IE W. V. Johnston, Assistan*, Director for Materials & Qualifications Engineering, DE L. S. Rubenstein, Assistant Director for Core and Containment Systems, DSI J. D. Saltzman, Assistant Director for State & Licensing Relations, OSP

'FROM:

R. L. Tedesco, Assistant Director for Licensing, DL

SUBJECT:

Input to Waterford 3 53ER

.The Waterford 3 SSER is scheduled to be published on September 18; however, there appear - to be ten issues that could be closed out if SSER publication is delayed three weeks. These issues are identified on the attached list as open item numbers:

5, 8,10,11,14(a),15,16,17, 24(e), ard 25. The information needed.to close out these issues is currently in-house.

It is particularly important that financial qualifications be addressed in the first supplement because the hearing date is tied to the issuance of the supplement which contains the financial evaluation.

I would appreciate your cooperation in providing SSER input to DL by September 22, 1981.

Or!ginnt signed by:

Rotert L. Tedesco, Assistant Director for Licensing Division of Licensing DISTRIBUT0N:

' Docket' File 150392 RLTedescc FJMiraglia I-SBlack p

NSIC 8109290047 ago927 TEM jDRADOCK 05000382 LB#3 Files PDR DL:LB#3 A l

DL: 'i[L

'\\

crv,ce >

y a.y esep y _,,,,,,,,,,,

suanAus > S.C,@,1,,a,c,k.;j,b,,,,

,,9,,

} i.a,

,,,,,R,L,,,

........T..[51,.,

9//

... 9ps../81 9/ /81 o4re >

i me rosu sia tio soj ecu o24o OFFICIAL RECORD COPY usam mi_m.m
E

'c-WATERFORD 3 STATUS REPORT OPEN ITEMS IN SER-

~~ APPL. RESPONSE DATE STAFF INPUT TO DL

1.

Fire Protection 09/18/81 2.

Licensee Qual.

11/30/81 12/31/81 3.

PSI /ISI' 11/15/81 12/31/81

4. ' Appendices G&H closed 5.

Emergency' Planning 06/17/81 09/15/81 6.

Environmental Qual.

1 0/01/81 7.

Seismic Qual.

in-house 8.

Steam Voiding in R.V.

in-house 09/15/81 9.. Feedwater line break analysis 09/10/81 10.

Loss of AC-or RCP's during MSLB in-house.

09/15/81

~

- 11. Clarification of transient analyses in-house 09/15/81 12.

RCP. Shaft Break 10/81

.13.

Pressure transient in Shield Bldg.

14. Thermal-hydraulit desiga closed (a)_DNBR in-house 09/,15/81 (b) ~CPC Software 03/82 (c).futurecycles 09/15/81
15. Site hazards in-house 09/08/81
16. Cold Shutdown without leaving CR in-house 09/15/81

-17.

Q-List-in-house 09/15/81 18.

Turbine missiles 10/30 11/81 19.

Emergency Feedwater control closed 20.

IEB 80-06 closed

21. Single fai' lure o# control system closed
22. ' Organic Materials closed

-23. -Plant Procedures 12/01/81 12/31

24. TMI(7)

(a)

I. A. l _

12/01/81 (b)-.I.B.1.2 12/01/81 (c)

I.C.'s.

long term requirement short term / closed (d)

I.D.1 04/82.

05/82 (e)

II.E.4.2 in-house 09/15/81 (f);II.F.2' N/S closed (g)

II.D.3

25.

Financial Qualifications 08/31/81 09/15/81