- Alab;ma Power Comp ny e
40 inverness Crntir Parkway Post Office Box 1295 Birmingham Alabama M201 Telephone 205 868-5581 b
1 W. G. Hairston, til Senior Vice President --
-l Nuclear Operations AlabamaPower 4
the sot.4 hem dectic 5ystem March 13, 1990 Docket No. 50-364 8-U. S. Nuclear Regulatory Comnission ATIN: Document Control Desk Washington, D. C.
20555 Joseph M. Farley Nuclear Plant Unit 2 Monthly operating Data' Report Attached is the February 1990 Monthly Operating Report for Joseph M. Farley Nuclear Plant Unit 2, required by Section 6.9.1.10 of the Technical Specifications.
If you have any questions, please advise.
Respectfully submitted,
/
N
., air on, III F
JGS:sme/l.6 Attachment cc:
Mr. S. D. Ebneter Mr. E. A. Reeves Mr. G. F. Maxwell l
t i
R-l l
i
o,
- .1 -
it;.;, _
q --
r b
..r, JOSElH M. FARLEY NUCLEAR PLAhrf LNIT 2-NARRATIVE SUtHARY-OF OPERATIONS J
c, February, 1990 i
?
There was' one significant power reduction durirut the month of February.--
'}
t On February 9, reactor power was reduced to allow contaminants to return from hideout on the secondary side of the steam generators. 'lhis hideout return is intended to reduce degradat. ion of the steam generator tubes. The.
unit returned to full power operation on February 12.
. The following major safety-related maintenance was performed in the mondi
- of Febnnry: -
e 1.
Seal fitting' leaks were repaired on the 2B charging pump.
2.
The -2C charging pump room cooler was cleanex1.
'3.
Maintenance was perforned on the 2A containment cooler fan.
- 4. - Miscellaneous corrective and preventive maintenance was perforwxl on the' diesel generators.
I) a
. j' j
i l
1 i
i
OPERATING DA'IA REPORT DOCKET No. 50-364 DATE 3/2/90 CCMPLE'IED BY D. N. Morey
'IELEPHONE (205)899-5156 OPERATING S'IA'IUS Notes
- 1. Unit Name:
Joseph M. Farley - Unit 2
- 2. Reporting Period:
February,1990
- 1) Cumulative data since
- 3. Licensed Thermal Power (MWt):
2,652 7-30-81, date of
- 4. Nameplate Rating (Gross MWe):
860 commercial operation
- 5. Design Electrical Rating (Net MWe): 829
- 6. Maximum Dependable Capacity (Gross MWe):
868.6
- 7. Maximum Dependable Capacity (Net MWe):
828.2
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons: N/A
- 9. Power Level To Which Restricted, If Any (Net NWe):
N/A
- 10. Reasons For Restrictions, if Any:
N/A
'1his Month Yr-to-Date Cumm11ative
- 11. Hours In Reporting Period 672 1,416 75,265
- 12. Number Of Hours Reactor Was Critical 672.0 1,416.0 58,093.9
- 13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
- 14. Hours Generator On-Line 672.0 1,416.0 64,488.0
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal Energy Generated (MWH) 1,631,313 3,601,619 163,857,886
- 17. Gross Electrical Energy Generated (MWH) 537,460 1,192,390 53,858,932
- 18. Net Electrical Energy Generated (NWH) 509,660 1,134,424 51,077,814
- 19. Unit Service Factor 100.0 100.0 85.7
- 20. Unit Availability Factor 100.0 100.0 85.7
- 21. Unit Capacity Factor (Using MDC Net) 91.6 96.7 83.0
- 22. Unit Capacity Factor (Using DER Net) 91.5,
96.6 81.9
- 23. Unit Forced Outage Rate
- 0. 0 ~
0.0 4.5
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A l
- 26. Units In Test Status (Prior to Comercial Operation):
Forecast Achieved INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELEC'IRICITY 05/24/81 05/25/81 COMMERCIAL OPERATION 08/01/81 07/30/81 rorm 2/30 i
l l
L DOCKET No.
50-364 UNIT 2
DATE March 2, 1990 COMPLETED BY D. N. Morey 1
TELEPHONE (205)899-5156 l
M0mE February DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (IWe-Net)
(!We-Net) 1 841 17 838 2
833 18 840 3
832 19 839 4
835 20 837 5
843 21 834 6
840 22 830 7
843 23 837 8
843 24 843 9
474 25 847 10 50 26 845-11 54 27 845 12 532 28 843 13 841 29 14 838 30 15 838-31 16-832 INSTRUCTIONS on this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.
Form 13/21
- -j %
UNIT SNUTDOWNS AND POWER REDUCTIONS DOCKET NO.
50-364 UNIT NAME
- J. M. FAR12Y - UNIT 2
'DATE March 2, 1990 COMPLETED BT D.' N.
MOREY '
REPORT MONTH Februar?
TEI.EPNoNE (2051899-5156 l
l l
l l
l METHOD OF l LICENSEE l l
l CAUSE & CORRECTIVE.
'l l
l l
l DURATION l l SHUTTING l EVENT l SYSTEM l COMPONENT l
ACTION TO lNO.
l DATE l TYPE l (HOURS) l REASON l DOWN REACTOR l REPORT 4 l CODE l CODE l
PREVENT RECURRENCE l-
.l 1
1 I
I i
1 I
I I
I l 001 l900209 l
S l
0.0 l
B l
N/A l
N/A l AB l
SG I
l Power was reduced to allow contaminants to return l,
)
l l
l l
l l
l l
lfrom hideout o.s the secondary side of the steam l
l l
l l
l l
l l
l' lsenerators.
I I
I I
i 1
1 I
I I
I.
I I
I I
I i
1.
I I
I l'
I I
I I
I I
I I
I I
I I
I I
I I
I I
I l-1 I
1 I
I I
I I
I I
I I
i-1 1
I I
I I
I I
I I
i 1
I I
I I
I I
I I
I l-I I
I I
I I
I I
I I
I l
i I
I I
I I
I I
I I~
I I
I I
I I
I I
I I
I i
i I
I I
I I
i i
I i
1 I
I I
i 1
I I
I i
l-i i
i I
I i
I i
I i
i i
l I
I I
I I
i i
I i
i l
I l
l i
l i
i i
i l
i I
I I
I I
I I
I i
i 1
1 I
I I
I I
I I
I I
I I
I I
I I
i 1-1 I
I I
I I
I l
l I
I I
I 1
1 I
I I
I I
I I
i i
1 I
I I
I I
I I
I I
1 i
F: Forced Reason:
Method:
Exhibit G-Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual B-Maintenance or Test for Preparation of Data 2-Manual Scram.
C-Refueling Entry Sheets for Licensee 3-Automatic Scram.
D-Regulatory Restriction Event Report (LER) File (NUREG-4-Other (Explain) 0161)