NRC-90-3500, Forwards SP/90 Position on Severe Accident Policy Issues Presented by NRC During 900209 ACRS Full Committee Meeting

From kanterella
Revision as of 02:36, 21 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards SP/90 Position on Severe Accident Policy Issues Presented by NRC During 900209 ACRS Full Committee Meeting
ML20012E926
Person / Time
Site: 05000601
Issue date: 03/20/1990
From: Johnson W
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Chris Miller
Office of Nuclear Reactor Regulation
Shared Package
ML20012E927 List:
References
NS-NRC-90-3500, NUDOCS 9004090096
Download: ML20012E926 (2)


Text

-

/~%

v; i

r i

Westinghouse Energy Systems Ba 355 Electric Corporation Eiff$bJrgh Perinsylvarua lb230 035$

r-March 20, 1990 L

NS-NRC-90 3500 Docket No. STN 50-601 I

i.

Document Control Desk i

U. S. Nuclear Regulatory Commission Washington. D.C. 20555 Attention:

Charles L. Miller, Director Standardization and Non-Power Reactor Project Directorate i

Subject:

Submittal of Westinghouse RESAR-SP/90 Position on " Severe Accident Policy Issues" Presented in February 9, 1990 ACRS Full Committee Meeting.

Dear Mr. Miller:

Enclosed are ten (10) non-Proprietary copies of the Westinghouse SP/90 position on the " severe accident policy issues" presented by the NRC during the February 9, 1990 ACRS Full Committee meeting.

The Staff presented their proposed resolution of fifteen " severe accident policy issues." During the RESAR-SP/90 PDA Licensing Program, most of these issues have been the subject of discussion between the Staff and Westinghouse, and a significant number of commitments have been made by l

Westinghouse as a result.

Some of these commitments are described in i

either the RESAR-SP/90 PDA text, in response to Staff questions, or in response to the Draft Safety Evaluation Report (08ER) PDA Open Issues.

Some of these " policy issues" have only recently been defined and the SP/90 positions had not yet been formally documented.

eeeen f

I 0968C/WMS/032000

e e

y a

4~

NS NRC 90-3500 Page 2' i

j.

I.

i

['

In order to facilitate the Staff's understanding of these commitments, the Westinghouse position on each of the fifteen issues has been compiled into a single document, which is herein submitted for placement on the SP/90 docket.

s Please let us know if there are any issues that need further clarification i

of our SP/90 position.

Very truly yours, A W h. LL -a

. J. Johnson, Manager Nuclear Safety Department Enclosure (s)

WMS/kf/

cc:

Loren Donatell - NRC (MS llH3)

Trevor Pratt - Brookhaven National Lab t

't l