Forwards Nonproprietary WCAP-9945 & Proprietary WCAP-9944, Verification of Upper Head Injection Reactor Vessel Internals by Preoperational Tests on Sequoyah 1 Power Plant
ML20032A873
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 10/26/1981
From: Rahe E
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: John Miller
Office of Nuclear Reactor Regulation
Shared Package
ML19260J225 List:
References
NS-EPR-2499, NUDOCS 8111020492
Download: ML20032A873 (2)


Text

_

.%[

f g,

s.

Westinghouse Water Reactor Nuclear Technology Division Electric Corporation Divisions Boxass PittsburghPennsylvania l5230 October 26, 1981 NS-EPR-2499 N

f

< 'd Mr. James R. Miller, Chief

& f, O $+j';A t.,

Special Projects Branch 2/

%jv p j' Division of Project Management U.S. Nuclear Regulatory Commission j'

o e'*!

Phillips Building ge3 g, G4 3 7920 Norfolk Avenue 14 0

' cc

/n

%,% f Bethesda, Maryland 20814 A_

D M.3

Dear Mr. Miller:

This submittal describes the internals vibration measurement and assurance program performed at Sequoyah 1 (50-327) and is to confirm the expected vibratior.s on the four loop UHI (Uppr Head Injection) upper internals assembly. The work was conducted in accordance with Regulatory Guide 1.20 using visual and transducer data during pre-and-post hot functional start-up.

Enclosed are:

1. Twenty-five (25) copies of " Verification of Upper Head Injection Reactor Vessel Internals by Preoperational Tests on the Sequoyah 1 Power Plant",

WCAP-9944, July 1981 (Proprietary).

2. Fifteen (15) copies of " Verification of Upper Head Injection Reactor Vessel Internals by Preoperational Tests on the Scquoyah 1 Power Plant",

WCAP-9945, July 1981 (Non-Proprietary).

Also enclosed are:

g

1. One (1) copy of Application for Withholding, AW-81-66 (Non-Proprietary).
2. One (1) copy of original Affidavit, AW-76-13 (Non-Proprietary).

This submittal contains proprietary information of Westinghouse Electric Corporati on.

In conformance with the requirements of 10CFR Section 2.790, as amended, of the Commission's regulations, we are enclosing with this

ubmittal an application for withholding from public disclosure and an affidavit. The affidavit sets forth the basis on which the information may be withheld from public disclosure by the Connission.

ggo A 2./3 h2cP

~

foO'l J

Y l

Yoo8 811102

.5 T

hs L

,, j.f o

  • Mr. J. R. Miller Page Two Correspondence with respect to the affidavit or application for withholding should reference AW-81-66 and should be addressed to R. A. Wiesemann, Manager of. Regulatory and Legislative Affairs. Westinghouse Electric Corporation, P. O. Box 355,' Pittsburgh, Pennsylvania 15230, Very truly yours, Xpww f4 E

P. Rahe, Jr., Manager v

uclear Safety Department MDB/kk Attachments