Forwards Insp Repts 50-445/92-62 & 50-446/92-62 on 921214-930121 & Notice of Violation.Two Significant Incidents Noted Where Temporary Mods Not Reviewed for Impact on Pending Clearances
ML20034E445
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 02/19/1993
From: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20034E446 List:
References
NUDOCS 9302260168
Download: ML20034E445 (6)


See also: IR 05000445/1992062

Text

j

'

.-

,

,

4,9 MCu

UNITED ST ATES

i

. .k

NUCLEAR REGULATORY COMMISSION

,e

,,

,

g

$f

j

REGloN IV

o,

[

Gli R VAN PLAZA DRIVE, SUITE 400

AR LINGTON. TE XAS 760118064

FEB 191993

i

Docket 50-445

,

50-446

License NPF-87

Construction Permit CPPR-127

i

.

TU Electric

ATTN:

W. J. Cahill, Jr., Group Vice President

Nuclear Engineering and Operations

,

Skyway Tower

400 North Olive Street, L.B. 81

Dallas, Texas 75201

.

SUBJECT: NRC INSPECTION REPORT 50-445/92-62; 50-446/92-62 (NOTICE OF

V10'AT10N);

i

This refers to the special inspection conducted by Mr. W. B. Jones and

.

G. E. Werner of this office on December 14, 1992, through January 21, 1993.

l

The inspection included a review of activities authorized for the Comanche

~

Peak Steam Electric . Station, Units 1 and 2, facility. At the conclusion of

,

!

the inspection,.the findings were discussed with you'and those members of your

j

staff identified in the enclosed report.

.

7

l

This special inspection was conducted to review programmatic and

-

implementation concerns with the station temporary modification program.

In

,'

l

addition, the effectiveness of previous corrective actions to correct

repetitive deficiencies with this program were evaluated.

i

Specific areas examined during the inspection are identified in the report.

l

'

Within these areas the inspection consisted of selective examinations of

1

procedures and representative records, interviews with personnel, and

!

observatiog of activities in progress.

'

Based on the results of this special inspection, certain licensed activities

l

-

. appeared to be in violation of NRC requirements as 'specified in the-enclosed

!

Notice of : Violation (Notice). . The violations are significant in that

!

repetitive problems with the implementation of the station temporary -

' modification program were identified but prompt- and effective corrective

}

.

actions were not taken to correct the deficiencies. -These deficiencies

included both technical- and administrative implementation problems. Numerous

occurrences were noted-where vital station drawings, used by operators to .

,

assess clearances and work-activities, were.not marked up to show active

.

temporary modifications. .Two significant incidents were noted where temporary-

.

'

modifications were not _ reviewed for their impact. on pending clearances.

The January 15, 1993, management meeting on the temporary modification program

.

-provided a comprehensive. overview of-the temporary modification program

8-

rstumpf

.

-

m'

G-

-;

'

-

..

_

_,

._ _ , m _

_ _ _ ,

.

-

-

..

.-

.

,

-

.

l

l

TU Electric

-2-

deficiencies discussed in this report.

During the presentation, your staff

identified several interim corrective actions which were being taken to

address the implementation concerns. The NRC subsequently reviewed the

effectiveness of the interim corrective actions and verified that the

temporary modification program was being adequately implemented.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

In your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence.

We request that your response include

,

an assessment of open plant incident reports greater than 90-days old. After

reviewing your response to this Notice, including your proposed corrective

actions and the results of future inspections, the NRC will determine whether

further NRC enforcement action is necessary to ensure compliance with NRC

regulatory requirements.

In accordance with 10 CFR Part 2.790 of the NRC's " Rules of Practice," a copy

of this letter and its enclosures will be placed in the NRC's Public Document

Room,

The responses directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the Office of Management and Budget, as

required by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.

'

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

'

Sincerely,

.

A. Bill Beach, Di ec or

!

Division of React

Pro cts

Enclosures:

1.

Appendix A - Notice of Violation

,

'

2.

Appendix B - NRC Inspection Report

50-445/92-62; 50-446/92-62 w/ attachment

cc w/ enclosures:

TU Electric

ATTN: Roger D. Walker, Manager of

Regulatory Affairs for Nuclear

Engineering Organization

Skyway Tower

400 North Olive Street, L.B. 81

Dallas, Texas 75201

i

.

-

.

.

'

.

-

-

s

,

.

TV Electric

-4-

FEB l 91993

bcc to DMB (IE01)

bcc distrib. by RIV:

J. L. Milhoan

Resident Inspector (2)

DRP

Section Chief (DRP/B)

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

DRSS-FIPS

RIV File

Project Engineer (DRP/B)

Section Chief (DRP/TSS)

DRS

l

qv{

  • RIV: SRI:DRP/B
  • RI:DRP/B
  • PE:DRP/B N C:DRP/B'DD:DRP

. dP

I

'

WBJones:ww

GEWerner

TReis

LAYandell

TPGwynn

BBeach

2/ /93

2/ /93

2/ /93

2/ /93

2//f/93

2//i/93

  • previously concurred

25000?

4

i

-

..

-

.

.

.

-

.

.

.

TU Electric

-3-

,

Juanita Ellis

President - CASE

1426 South Polk Street

Dallas, Texas 75224

GDS Associates, Inc.

Suite 720

!

1850 Parkway Place

Marietta, Georgia 30067-8237

TU Electric

Bethesda Licensing

3 Metro Center, Suite 610

Bethesda, Maryland 20814

.

.

Jorden, Schulte, and Burchette

i

ATTN: William A. Burchette, Esq.

,

.

'

Counsel for Te;:-La Electric

Cooperative of Texas

1025 Thomas Jefferson St., N.W.

!

!

Washington, D.C.

20007

Newman & Holtzinger, P.C.

.

i

ATTN: Jack R. Newman, Esq.

1615 L. Street, N.W.

'

Suite 1000

Washington, D.C.

20036

Texas Department of I.icensing & Regulation

'

,

ATTN:

G. R. Bynog, Program Manager /

.

Chief Inspector

'

Boiler Division

P.O. Box 12157, Capitol Station

Austin, Texas 78711

Honorable Dale McPherson

,

i

County Judge

P.O. Box 851

Glen Rose, Texas 76043

Texas Radiation Control Program Director

1100 West 49th Street

Austin, Texas 78756

Owen L. Thero, President

'

Quality Technology Company

.

Lakeview Mobile Home Park, Lot 35

4793 E. Loop 820 South

,

'

Fort Worth, Texas 76119

. .

-

,.

,

.

.

.

TV Electric

-4-

FEB 191993

bcc to DMB (IE01)

bcc distrib. by RIV:

J. L. Milhoan

Resident Inspector (2)

DRP

Section Chief (DRP/B)

Lisa Shea, RM/ALF, MS: MNBB 4503

MIS System

DRSS-FIPS

RIV File

Project Engineer (DRP/B)

Section Chief (DRP/TSS)

DRS

.

  • RIV: SRI:DRP/B
  • RI:DRP/B
  • PE:DRP/B ')b :DRP/B

D:DRP

3: IP

C

WBJones:ww

GEWerner

TReis

LAYandell

TPGwynn

BBeach

2/ /93

2/ /93

2/ /93

2/ /93

2//f/93

2//i/93

  • previously concurred