ML20043H898

From kanterella
Revision as of 14:39, 19 December 2024 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Notification of 900717 Meeting W/Util in Rockville,Md to Discuss Licensee Approach to Reactor Vessel Evaluations
ML20043H898
Person / Time
Site: Yankee Rowe
Issue date: 06/19/1990
From: Sears P
Office of Nuclear Reactor Regulation
To: Wessman R
Office of Nuclear Reactor Regulation
References
NUDOCS 9006270041
Download: ML20043H898 (3)


Text

e i

June 19, 1990 Docket No.50-029.

~ MEMORANDUM FOR:

Richard H. Wessman, Director Project Directorate I-3 Division of Reactor Projects I/II FROM:

Patrick M. Sears, Project Manager Project Directorate I-3 Division of Reactor Pro!ects 1/11

SUBJECT:

FORTHCOMING MEET 1tm WITI YANKEE R0WE CONCERNING REACTOR YESSEL EVALUATISH DATE & TIME:

Tuesday, July 17, 1990 9:00 a.m. to 12:00 noon LOCATION:

Room BD11 One White Flint North 11555 Rockville Pike Rockville, Maryland 20852 PURPOSE:

To discuss the licensee's approach to reactor vessel evaluations including the following 1 Results of surveillance data, j

Capacity (a)oinspectthebeltline.

2 t

Plans; for complying with Appendix G, 10 CFR 50, 3

particularly a means for vessel inspection, (b) for accurately determining the reference temperatures for the beltline lower plate and circumferential weld.

4)ResultsofPTSanalysis

  • PARTICIPANTS:

NRC Utility B.Elliot J. Richardson J.DeVincentis N.Randall S.Varga J.Haseltine K.Wichman R.Wessman R. Carter C.Y.Cheng B.Boger et al.

P. Sears R.Barrett D.Persinko R. Jones i

/s/

Patrick M. Sears, Project Manager i

Project Directorate 1-3 Division of Reactor Projects 1/11 cc:- See next page

  • Meetings between NRC technical staff and licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NRC Staff Policy," 43 Federal Register 28058, 7g.

k b

P 3/ H
PDI-3/
  1. r R

abrook

PSeafs
RWess n

/Q/90

to/W/90
f/.t/90

[

l OFFICIAL RECORD COPY (fp Document Name: YR MEETING 7/17/89 9006270o41 9006 t

0 gos ADock osooo.19 o29 PDC

CC:

1 Dr. Andrew C. Kacek, President and Chief Operating Officer-4 Yankee Atomic Electric Company S80 Main Street Boltnn, Massachusetts 01740-1398 Thomas Dignan, Esquire Ropes and Gray 225 Franklin Street Boston, Massachusetts 02110 Mr. T. K. Henderson Acting Plant Superintendent Yankee Atomic Electric Company 1

Star Route Rove, Massachusetts 01367 j

Resident inspector Yankee Nuclear Power Station i

U.S. Nuclear Regulatory Comission i

Post Office Box 28 t

Monroe Bridge, Massachusetts 01350 Regional Administrator, Region I U.S. Nuclear Regulatory Connission 475 Allendale Road King of Prussia, Pennsylvanie 19406 Robert M. Hallisey, Director Radiation Control Program Massachusetts Department of Public Pealth 150 Tremont Street, 7th Floor Boston, Massachusetts 02111 Mr. Gentge Sterzinger

- Connissioner Vermont Department of Public Service 1/0 State Street. 3rd Floor Montpelier, Vermont 05602 Ms. Jane M. Grant Senior Engineer - PLEX Licensing Yankee Atomic Electric Company

-f.80 Main Street Bolton, Passachusetts 01740-1398

- + <

-v u---

g-I#

o-u I'

s u,

f.

DISTRIBUTION:

1 mg 1

NRC & Local PDRs

(..

PDI-3 Reading T.Murley/F.Miraglia J.Partlow S.Varga

- B.Boger P. Sears i

C.Haughney 1

I-OGC l

E. Jordan i

B. Grimes Receptionist (WF) l B.Elliot i

N.Randall K.Wichman C.Y.Cheng D.Persinko J. Richardson R.Barrett P.obert C. Jones, Jr. - BE23 ACRS(10)

GPA/PA Y. Wilson L. Thomas K. Abraham, Region 1 M.Rushbrook i-J.Caldwell - 17G21 l

Jon Johnson, Region 1 l

W. Russell l

?

i l

l-1 I

l L

-i l

e

'