ML20045G966

From kanterella
Revision as of 10:46, 19 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Errata Sheet to Intervenor Response to Georgia Power Co First Set of Interrogatory Questions.* Related Correspondence
ML20045G966
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 07/06/1993
From: Kohn M
GEORGIA POWER CO., KOHN, KOHN & COLAPINTO, P.C. (FORMERLY KOHN & ASSOCIA
To: Bloch P, Carpenter J, Murphy T
Atomic Safety and Licensing Board Panel
Shared Package
ML20045G967 List:
References
CON-#393-14091, CON-#393-14092 93-671-01-OLA-3, 93-671-1-OLA-3, OLA-3, NUDOCS 9307160198
Download: ML20045G966 (1)


Text

[

TRATED00RRESPONDENCE UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD

'93 Jg _g p.

Before Administrative Judges:

Peter B.

Bloch, Chair i

Dr. James H.

Carpenter Thomas D.

Murphy

)

In the Matter of

)

)

Docket Nos. 50-424-OLA-3 GEORGIA POWER COMPANY

)

50-425-OLA-3 21 al.,

)

)

Re: License Amendment (Vogtle Electric Generating

)

(transfer to Southern Nuclear)

Plant, Unit 1 and Unit 2)

)

)

ASLBP No. 93-671-01-OLA-3 ERRATA SHEET TO INTERVENOR'S RESPONSE TO GPC'S FIRST SET OF INTERROGATORY OUESTIONS Pace

_I i_ng wordina to be chanced new wordi_DH t

29 15 don't didn't 29 16 don't didn't 33 18 Operations Shift Superintendent Supervisor 34 12 set seen 35 22 analyzed unanalyzed Respectfully submitted, l

l

,. Q,

/

l Michael D.

Kohn Kohn, Kohn & Colapinto, P.C.

l 517 Florida Ave.,

N.W.

l Washington, D.C.

20001 (202) 234-4663 054\\ errata 9307160198 930706 PDR ADOCK 05000424 i

9s 3 o

o eon i