ML20054E653

From kanterella
Revision as of 18:16, 17 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Order Granting Westinghouse 820609 Request for Extension of Time Until 820626 to File Appeal from ASLB 820527 Memorandum & Order.Other Parties Time to Appeal Also Extended
ML20054E653
Person / Time
Site: Point Beach  
Issue date: 06/10/1982
From: Shoemaker C
Atomic Safety and Licensing Board Panel
To:
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
References
NUDOCS 8206140033
Download: ML20054E653 (2)


Text

.

UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING APPEAL BOARD r ? '.i;5

,,.yI Administrative Judges:

Thomas S. Moore, Chairman Dr. W. Reed Johnson I'

Dr. Reginald L.

Gotchy

~ ;

~

g--

)

In the Matter of

)

)

WISCONSIN ELECTRIC POWER COMPANY

)

Docket Nos. 50-266

)

50-301 (Point Beach Nuclear Plant,-

)

Units 1 and 2)

)

(OL Amendment)

)

ORDER June 10, 1982 By letter dated June 9, 1982, counsel for Westinghouse Electric Corporation seeks an extension of time, to and in-cluding, June 26, 1982, within which to file an appeal from the May 27, 1982, memorandum and order of the Licensing l

Board.

Treating counsel's letter as a motion, the motion is granted.

Other parties may also have the same time within which to file an appeal.

l D600 8206140033 820610 PDR ADDCK 05000266 G

PDR

__