ML20054L763

From kanterella
Revision as of 16:43, 17 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
IE Safeguards Insp Rept 70-0025/82-05 on 820621-25.No Noncompliance Noted.Major Areas Inspected:Security Plan & Procedures,Security Organization Personnel & Security Audit. Details Withheld Ref (10CFR2.790 & 10CFR73.21)
ML20054L763
Person / Time
Site: 07000025
Issue date: 07/01/1982
From: Schaefer D, Schuster M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML20054L758 List:
References
70-0025-82-05, 70-25-82-5, NUDOCS 8207080451
Download: ML20054L763 (1)


Text

__-

SAFEGUARDS INFORMATION The information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790.

U.S. IlUCLEAR REGULATORY COMMISSION Region V Report flo. 70-25/82-05 (IE-V-504)

Docket flo. 70-25 License No.

SNM-21 Safeguards Group Licensee:

Energy Systems Group - Rockwell International 8900 De Soto Avenue Canoaa Park. California 91304 Facility flame:

De Soto Facility Inspection at:

Canoga Park. California Inspection Conducted:

June 21-25.1982 Date of Last Physical Security Inspection Visit:

Anril 19 21 1CR2 Type of Inspecti n:

nnntinn_ nn a nnnin ne nri Phvcical Prntnetinn Inspectors:

Y>rd. (L]

n~rs30 I9SO uv Dennis W. Schaefer Physical Protectiori Specialist

[/

Date ' Signed Date Signed Date Signed ftpproved by: @[3 iua

/<?2 M. D. Schuster, Chief, Physical Security Section Date Signed Inspection Summary:

Areas Inspected: Security Plan and Procedures; Security Organization -

Personnel; Security Program Audit; Records and Reports; Testing and Maintenance; Locks; Keys and Combinations; Physical Barriers-PA; Physical Barriers-VA, MAA; Security System Power Supply; Assessment / Surveillance Aids; Access Cc.ntrol - Personnel; Access Control - Packages; Access Control - Vehicles; Detection Aids - PA; Detection Aids - VA, MAA; Alarm Stations; Communications; and 10 CFR 73 Appendix B and C.

The inspection involved a total of 35 inspector hours onsite by one NRC inspector.

The inspection began during the day shift period.

Res The licensee was found to be in compliance with NRC requirements witt in 'the areas examined during the inspection.

8207080451 820701 1WIhSUREC0!rrATNS SAFEGUARDS IN1TEDIATION.

PDR ADOCK 07000025 C

urou smarrIon mis SAFEGUARDS INFORMA iviv PDR PAGE IS DE00BIBOLLED.

_ ___ _ __ _