ML20059B875

From kanterella
Revision as of 03:22, 17 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Exam Rept 50-373/OL-93-01 for Both Units During Wk of 931025.No Violations Noted.Weaknesses Noted in Areas of Communication
ML20059B875
Person / Time
Site: LaSalle  
Issue date: 12/23/1993
From: Ring M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Murphy W
COMMONWEALTH EDISON CO.
Shared Package
ML20059B879 List:
References
NUDOCS 9401040274
Download: ML20059B875 (2)


Text

p8 7

vy.

m.

l v

DEC 2 31993 1

1 I

' Docket No. 50-373 Docket No. 50-374 j

f Commonwealth' Edison Company

.LaSalle County Nuclear Station

' ATTN:

Mr..W. Murphy.

Site Vice President-1 2601 No'. 21st' Road

-l Marseilles, IL' 61341-j

Dear.Mr.. Murphy:

SUBJECT:

INITIAL LICENSE EXAMINATION REPORT During the' week of October 25, 1993, Mr. M. Bielby. and others administered initial license examinations to six employees of your organization who operate

..the LaSalle County Nuclear Station. At the. conclusion of the examination, findings-identified as a result of the examinations were discussed with those members of your staff. identified in _the enclosed report.

3 LFour previously non-licensed operators.were administered Reactor Operator g

2 examinations, and two were. administered Senior Reactor Operator: examinations, qm

,{

. All individuals passed all sections of their respective examinations.

n, Ouring administration of the operating portion of the examination, weaknesses L

twere identified in-the~ area of communication. As a result of the written F

examination, additional weaknesses were identified in the knt. sledge of-

[

~ systems," abnormal and emergency procedures.

No written response is necessary for these items.

In.accordance with 10 CFR 2.790 of the Commission's regulations, a. copy of '

t

[

this letter. and the enclosures will be placed'in the NRC Public Document Room.

Should you have any questions concerning this examination, please contact us.

p Sincerely, 030120 y...;._.,

Mark A. Ring, Chief

^

Operations Branch

-See Attached' Distribution

.RIII RIII RIII RI F 1p~ f<M.

jp $r K'S qf U

g.Ha)gue

.Bielby/mb/cg Jordan Ring 12/23/93-12/23/93

/ 12/23/93 12/d/93 l

9401040274 931223 ~

PDR: ADDCK 05000373 f(/

0' /.

[

1*

"~

1 f

DEC 2 31993 f

Commonwealth Edison Company 2

l-i k

See Attached Distribution I

l J

Enclosures:

1.

Examination Report No. 50-373/0L-93-01 2.

Simulation Facility Report l

l:

3.

Facility Comments and NRC Resolution 1

l 4.

Examination and l

Answer Keys (R0 and SRO) i l.

j cc w/ enclosures 1-3.

j L. O. DelGeorge, Vice President, l

Nuclear Oversight and Regulatory Services J

J. Schmeltz, Acting Station Manager j

J. Lockwood, Regulatory Assurance j'

Supervisor I

D. Farrar, Nuclear Regulatory l

Services Manager OC/LFDCB Resident Inspectors LaSalle Dresden, Quad Cities l

Richard Hubbard i

J. W. McCaffrey, Chief, Public l

Utilities Division Robert Newmann, Office of Public Counsel State Liaison Officer L

Chairman, Illinois Commerce l

Commission l

J. Kennedy, LPM, NRR l

R. Gallo, Branch Chief, OLB C. Tyner, INEL D. Prawd;: K, INEL W. Axelson, RIII cc w/ enclosures I-4:

S. R. Harmon, Plant Training Manager bcc w/ enclosures 1-4:

PUBLIC - IE42 l

L l

L y

l 4

._-