Monthly Operating Rept for Sept 1990 for Vermont Yankee Nuclear Power Station
ML20064B321
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 09/30/1990
From: Murphy W, Wallin G
VERMONT YANKEE NUCLEAR POWER CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
VYV-90-287, NUDOCS 9010160118
Download: ML20064B321 (6)


Text

.

. V ERMONT Y ANKEE N UCLEAR-POWER CORPOR ATION R O. BOX 157 GOVEltNOR HUNT ROAD c

VERNON, VERMONT 05354 i

October 10, 1990 VYV 90-287 ll U.S.--Nuclear-Regulatory Commission ATTN: Document Control Desk Washington, D.C.

20555

Dear Sir:

Submitted herewith is the Monthly Statistical Report for the Vermont Yankee Nuclear Power Station for the month of September, 1990.

)

very truly yours, VERMONT YANKEE NUCLEAR POWER CORP.:

j Warren.l. Murphy"f"f s~-

Senior Vice^ Pres drnt, Operations' cet= 1) USNRC Region-I 475 Allendale Road King'of: Prussia, PA 19406

2) USNRC Resident Inspector, VYNPS I

,DP 0411 Rev..

3-M Page 1.of 1.

sp L,

t k

A.+.

ej' 9010160118 900930 DR ADOCK O'500 1

g N>N.Om N/

r 7

c.,

-1 4

t i

i VERMONT YANKEE NUCLEAR POWER STATION MONTHLY STATISTICAL REPORT 90-09 i

FOR THE' MONTH OF SEPTEMBER, 1990 e

l

,i 1

_DP 0411~Rev. 3 Page-1 of 1 l

ali.

, :)

]

2 r*

m t

- }.'.

I'j.

4' i /

' l 3 '1 ;.

, j ',

r q

OPERATING DATA REPORT D0?KET NO.

50-271-DATE 901010 COMPLETED BY-G.A. Wallin TELEPHONE (802)257-7711 OPERATING STATUS J

- 1. : Unit' Names Vermont Yankee NOTES:

2.

. Reporting Period:

September

3.

Licensed Thermal Power (MWt):

1593 4.:

Nameplate Rating (Gross MWe):

540

5.. Design. Electrical Rating (Net MWe)
514(oc) 504(cc) 6.

Maximum Dependable capacity (Gross MWe): 535 17. - Maximum Dependable capacity (Net MWe):

504 8.

If changes occur in capacity ratings (Items Number 3 through 7)since last report, give reasons:

N/A 9.

Power level to which restricted, if any(Net MWe):

N/A 10. ' Reasons for restrictions, if any:

N/A l

This Month Yr-to-Date. Cumulative 1

720.00 6551.00' l'1.

Hours In Reporting Period 0.00' 5669.37 126335.23 a

12.

Number Of Ilours Reactor was Critical 13.

Reactor Reserve Shutdown Hours 0.00 0. 0_0 0.00-14.

Hours Generator On-Line 0.00 5580.36-123557.43 15. - Unit Reserve Shutdown Hours 0.00 0.00 0.00-16.

Gross Thermal Energy Generated (MWH) 0.00 8570857.50 182580414.00

' 17.

Gross ElectricalEEnergy Generated 6~66

-}878197.00-60832086,00 H

18.

Net Electrical Energy Generated (MWH) 0.00 3 738578.00-57754277.00 L 19 '.. Unit' Service Factor O.00

85.18

-78.19 20.

Unit Availability Factor 0.00-85.18-

-78.19

~

21..

Unit Capacity Factor (Using-MDC Net) 0.00-83.94 72.52'

.22.: Unit Capacity Factor (Using DER Net)

< 0. 00-8:.33 71.11 2 3 ', -Unit Forced-Outage' Rate 0.00 2.26-

-5.57

)

324.

shutdowns scheduled over next 6 months (Type, Date, and-Duration of-

-l Each):

1990 Refueling Outage began on August 31, 1990 for six weeks duration.

25.-

If shut down at end of report period, estimated de te of startup:10/15/90-

,:26.

Units In Test Status (prior to commercial operatior.): N/A d

Forecast Achieved INITIAL CRITICALITY INITIAL ~ ELECTRICITY COMMERCIAL OPERATION

~

VYDPF 0411'.01 DP 10 411 : Rev ~. 3 Page 1 of'1 RT No. 13.F01.19F j

l l

1 ff

s g :.y a,

c. :,

t AVERAGE DAILY UNIT-POWER LEVEL 1-t

- \\..

DOCKET.NO. 50-271 UNIT Vermont Yankee DATE 901010 COMPLETED BY

-G.A. Wallin TELEPHONE TBF2)257-7711

'i.

MONTH September

'_ DAY-AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) l 1,

0 17.

0-2.

0 18.

0 3.

0 19.

0 4.

0 20, 0

5.

0 21.

O i

6.

0 22.-

0-3

~

7.

_0 :

23.

0 8.-

0 24.

0 9.

0 25.

0 0

26.

0 10

11. = '

O 27.

0 12.

0

.28.

0 7

13.

0 29.

O y

,_; \\i 14. -

0 30.

0 "15.

0 31.

16.-

0

[lINSTRUCTIONS:

J

...On'!this' format, list the: average daily unit' power _ level in-MWe-Net sl",for.each-. day in;the reporting month. ' Compute'to the nearest whole 4:ogawat t..,

j

'VYDPF'0411.02 lDP'0411: Rev. 3

Pcge,lof 1 h

RT No. 13.F01.18V i[,

.,,r t-9

)

I

~ ' '

?

'c

'i;

,3n 1: '

_r,

~

d%

. UNIT SHUTDOWNS.AND. POWER REDUCTICNS w

DOCKET No 50-271 REPORT MONTH SEPTEMBER UNIT WAME Vermont Yankee-DATE 901010 COMPLETED SY G.A.

Wallin TELEPHONE (802)257-7711 1

2 Method of License

. system Component Cause and Corrective

'No.

Date Type Duration Reason Shutting Down Event Code Code Action to (hours)

Reactor

'3 Report #

4 5

Prevent Recurrence 90-08 900930 5

720.00

.C,8 1

N/A N/A N/A Shutdown for 1990 Refueling /

(Cont)

Maintenance outage.

1 r: Forced 2 Reason:

3 Method:

4 Exhibit G-Instructions S: Scheduled A-Equipment railure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Licensee' C-Refueling "3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Other (Explain)

(NUREG.0161)

E-Operator Training and License. Examination F-Administrative 5 Exhibit I - Same Source VYDPF 0411.03 C-operational Error (Explain)

DP 0411 Rev. 3 H-(Explain)

Page 1 of 1

DOCKET NO. 50-271 d

UNIT Vernent Ynnkeo DATE 901010

~*

COMPLETED BY G.A.

Wallin

~.;

TELEPHONE (802)257-7711 REPORT MONTH September

[

SUMMARY

OF OPERATING EXPERIENCES Highlights Varmont Yankee operated at 00.0% of rated thermal power for the month.

Gross electrical generation was O

MWHe or 00.0% design electrical capacity.

Op3 rating Summary

.The following is a chronological description of plant operations including-other pertinent items of interest for the month:

'[At the beginning of the reporting period the plant was operating at 00.0%-

of rated. thermal power.

Thore were no'. items of interest to report for this month.

I

s. 4 t

'At'the end of the reporting period the plant was shutdown:for the 1990 ER9 fueling / Maintenance outage.

VYDPF 0411.04 DP 0411 Rev. 3-Page'1~of 1 RT:No. 13.FOl'.18X.