ML20067B723
| ML20067B723 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 02/04/1994 |
| From: | Gates W OMAHA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML19303F907 | List: |
| References | |
| NUDOCS 9402250067 | |
| Download: ML20067B723 (2) | |
Text
'
D
. 2 %#Ma$p?AWMSWMwda%AMaMu=2Mm&MLM&MELAiaE;fWiin y mmygi?F?;Ti=sem%gr&
=
SMO hmg Omaha Public Power District 444 South 16th Street Mall Omaha, Nebraska 68102-2247 402/636-2000 February 4, 1994 LIC-94-0044 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Mail Station Pl-137 Washington, DC 20555
Reference:
Docket No. 50-285 Gentlemen:
SUBJECT:
Transmittal of Changes to the Fort Calhoun Station (FCS) Emergency Plan Implementing Procedures (EPIP)
In accordance with 10 CFR 50 Appendix E Part V and 10 CFR 50.4(b)( )(iii), the followin EPIP changes are enclosed for the Document Control Desk holder of Copy 165 and the NRC Region IV Administrator (holder of copies 15, 155 and 156).
P ease return the transmittal sheets to confirm your receipt of these changes.
REMOVE SECTION INSERT SECTION EPIP Index, page 1, issued 12/30/93 EPIP Index, page 1, issued 1/17/94 EPIP Index, page 2, issued 8/26/93 EPIP Index, page 2, issued 1/27/94 EPIP-RR-17A, R8, issued 8/27/93 EPIP-RR-17A, R9, issued 1/27/94 Summary of Chanaes EPIP Index pc,e 1 is being changed to correct the title of EPIP-E0F-19.
EPIP-RR-17A is b.
) revis.< to change the Warehouse Foreman's Pager number. The task of transferring event chronology information and priorities tracking is being reassigned, and new instruction for transferring fuel oil from storage tank F0-10 to F0-1 is being added. Note: EPIP-RR-17A contains proprietary
(' ! 1
/
information.
bp v f
\\V
\\
r l' jfk ((b 1
.I 2 Ac v u,,,
d a
1.
t g
- jR22ggggJeM88ggs
[g f g g
/
e
.s m.
~~_
Maie/FerMe
+
U. S. Nuclear Regulatory Commission LIC-94-0044 Page 2 If you should have any questions, please contact me.
Sincerely, 4V. k. &
W. G. Gates Vice President WGG/mah Enclosures c:
LeBoeuf, Lamb, Leiby & MacRae (w/o Enclosures)
L. J. Callan, NRC Regional Administrator, Region IV S. D. Bloom, NRC Project Manager (w/o Enclosures)
R. P. Mullikin, NRC Senior Resident Inspector (w/o Enclosures)
E 1
l I
..