Interim Deficiency Rept DR-65 Re Cracking & Spalling of Surface Concrete Around Penetrations.Initially Reported on 820806.Investigation Continuing.Next Rept Will Be Provided by 821203
ML20069H081
Person / Time
Site: River Bend Entergy icon.png
Issue date: 10/07/1982
From: Booker J
GULF STATES UTILITIES CO.
To: Jay Collins
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, DR-65, NUDOCS 8210190367
Download: ML20069H081 (1)


Text

l

/

/

O (j,1 i

l' GULF STATES UTILITIES COMPANY

)

POST OFFICE BOX 2951 DEAUMONT.

V

,J-77 AREA COoE 713 838-6631 October 7, 1982 REG-13,492 File Nos. G9.5, G9.25.1.1 Mr. John T. Collins, Regional Administrator U. S. Nuclear Regulatory Commission Region IV, Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Arlington, Texas 76011

Dear Mr. Collins:

River Bend Station Unit 1 Docket No. 50-458 Interim Report /DR-65 On August 6,1982, Gulf States Utilities Company (GSU) notified the Nuclear Regulatory Commission's Region IV Office of a condition potentially reportable under 10CFR50.55(e) concerning cracking and spalling of surface concrete around penetrations in the River Bend Station Drywell Wall (DR-65). GSU has not completed its investigation at this time. An interim or final status report will be provided by December 3, 1982.

Si erely, s

L

[J.E.Boker Manager-Engineering & Licensing River Bend Nuclear Group JEB/RJK/kt cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 R. L. Brown (RRI)

,~