ML20070N622

From kanterella
Revision as of 09:21, 16 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Responds to IE Bulletin 82-04 Re Use of Bunker-Ramo Electrical Penetrations for safety-related Sys.No Bunker- Ramo Electrical Penetrations Installed
ML20070N622
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 01/03/1983
From: Clayton F
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
REF-SSINS-6820 IEB-82-04, IEB-82-4, NUDOCS 8301250559
Download: ML20070N622 (1)


Text

Malling Address Alc b~m2 Power Company 600 North 18th Street 8

Post Offica Box 2641 Birmingham Alabama 35291 Telephone 205 783-6081 F. L. Clayton, Jr.

S*2s' 'OZ",*"'

AlabamaPower i

] ' 1 \\' Iq ay.l[

ttm southem electnc system January 3, 1983 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission Region II, Suite 3100 101 Marietta Street, N. W.

Atlanta, GA 30303 Attention:

Mr. J. P. O'Reilly Joseph M. Farley Nuclear Plant - Units 1 and 2 I.E. Bulletin No. 82-04 Gentlemen:

I.E. Bulletin No. 82-04 requires Alabama Power Company to respond by March 2, 1983 on the use of Bunker Ramo electrical penetrations for safety-related systems at Farley Nuclear Plant.

No Bunker Ramo electrical penetrations are installed or planned to be installed in safety-related systems at Farley Nuclear Plant; therefore, no further response will be made to this bulletin.

If you have any questions, please advise.

Yours very truly, m

F. L. Cl ayton J r.

l 1

F LCJ r/J AR :l s h-D7 l

cc:

Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. S. A. Varga SWORN TO AND SUBSCRIBED BEFORE ME Mr. E. A. Reeves THIS 3 d DAY OF A w,c, 1983 Mr. W. H. Bradford V

kb

,* ?

Notiry P'ublic 8301250559 830103 PDR ADOCK 05000348 xpires MyComm)ision

$[3 (

G PDR jo z,

p 3-A

)