W LILCO, June 7, 1983 UNITED STATES OF AMERICA
'b 9
5UCLEAR REGULATORY COMMISSION
, G, '
pg L'Sthf G,
Before the Atomic Safety and Licensing Boar 3
- Jgg,
- \\
0 1983 s T1!
' !{rg, In the Matter of
-~ )
)
s LONG ISLAND LIGHTING COMPANY
)
Docket No. 50-322 (01.),
,s
)
(Emergency Planning)
(Shoreham Nuclear Power Station, )
Unit 1)
)
LILCO'S STATUS REPORT ON THE SCHEDULE FOR FILING EMERGENCY PLANNING CONTENTIONS In its " Order Confirming Adjustment in Schedule to File Contentions," dated May 5, 1983, the Licensing Board with au-thority over the other issues in this case granted Suffolk County's request for additional time to draft contentions, ex-tending that time by one week to a date four weeks after j
receipt of LILCO's revised emergency plan.
The Board also ordered that
[w]ithin two weeks after receipt of LILCO's re-vised plan, the parties shall, on a coordinated basis, report to the Board their agreement or l
disagreement on whether the four week period for receipt of draft contentions should be adjusted l
l slightly, in either direction, due to the unex-i pectedly concise or extensive content of LILCO's l
revision to its emergency plan.
l l
On Thursday, June 2, 1983, counsel for LILCO, Suffolk County, the Town of Southampton, and the NRC Staff discussed by conference call _/ the status report due the Board from the l
I l_/
Counsel for Suffolk County statMd during the conference call that counsel for SOC and NSC had been informed of the call but were unable to participate.
l,.
0306090295 830607 PDR ADOCK 05000322 l
0 PDR q
.~
parties regarding the schedule for submitting draft conten-tions.
Suffolk County suggested during this call that it required an additional six weeks to review the plans served by LILCO on May 26, 1983, thus extending the date draft conten-tions would be due to mid-August.
LILCO opposed this' lengthy extension.
On Monday, June 6, 1983, counsel for the County indicated in a call with LILCO's counsel that the intervenors were filing a status report on June 8 or 9 without LILCO / because of the 2
difference in position among the parties, and that LILCO should file its own status report stating its position on the sched-ule.
Counsel for the County also indicated during the June 6 call that, while'its precise position had not yet been i
formulated, it intended to suggest in its status report that filing contentions on certain of the plans before the Board would be premature or inappropriate.
It continues to be LILCO's position that (1) the four weeks allowed by the Board is ample time in which to produce draft contentions and (2) those contentions should address the LILCO-County plan and the LILCO interim plans.
With the power plant scheduled to be physically ready to load fuel by August, the scheduling of the remaining emergency planning litigation is becoming of increasing concern to LILCO.
In light of the nature of the filings anticipated from the intervenors, LILCO 2/
Counsel for Suffolk County was unsure whether the interve-nors would file a joint report or separate reports.
JV
, requests that this Board allow it to respond in writing on Monday, June 13, 1983, to the intervenors' status report.
Counsel for NRC Staff has authorized us to state it joins in LILCO's status report to the Board, and that it too would like to respond on Monday, June'~i3 to the intervenors.' status report.
Respectfully submitted, Kdthy [,.
B.
McCleskey James N. Christman Hunton & Williams P.O. Box 1535 Richmond, Virginia 23212 DATE:
June 7, 1983
LILCO, June 7, 1983 CERTIFICATE OF SERVICE
< =.
In the Matter of LONG ISLAND LIGHTING COMPANY (Shoreham Nuclear Power Station, Unit 1)
Docker No. 50-322 (OL)
I hereby certify that copies of LILCO's Status Report on the Schedule for Filing Emergency Planning Contentions were served this date upon the following by first-class mail, post-age prepaid, or (as indicated by one asterisk) by hand, or (as indicated by two asterisks) by Federal Express.
James A.
Laurenson,*
Secretary of the Commission Chairman U.S. Nuclear Regulatory Atomic Safety and Licensing Commission Board Washington, D.C.
20555 U.S. Nuclear Regulatory Commission Atomic Safety and Licensing Washington, D.C.
20555 Appeal Board Panel U.S. Nuclear Regulatory Dr. Jerry R.
Kline*
Commission Atomic Safety and Licensing Washington, D.C.
20555 Board U.S.
Nuclear Regulatory Atomic Safety and Licensing Commission Board Panel Washington, D.
C.
20555 U.S.
Nuclear Regulatory Commission Dr.
M.
Stanley Livingston**
Washington, D.C.
20555 1005 Calle Largo Sante Fe, New Mexico 87501 Bernard M. Bordenick, Esq.**
David A.
Repka, Esq.
Daniel F.
Brown, Esq.*
U.S. Nuclear Regulatory Commission Attorney Atomic Safety and Licensing Washington, D.C.
20555 Board Panel U.S. Nuclear Regulatory Commission Nashington, D.C.
20555
at l.l-
- J David J. Gilmartin, Esq.
Stephen B. Latham, Esq.**
Attn:
Patricia A. Dempsey, Esq. Twomey, Latham & Shea County Attorney 33 West Second Street Suffolk County Department P.O. Box 398 of Law Riverhead, New York 11901 Veterans Memorial Highway Hauppauge, New York 117871 Ralph Shapiro, Esq.**
F
' ~Cammer and Shapiro, P.C.
l Herbert H.
Brown, Esq.*
9 East 49th Street Lawrence Coe Lanpher, Esq.
New York, New York 10016 Christopher McMurray, Esq.
f Kirkpatrick, Lockhart, Hill, James Dougherty, Esq.*
l Christopher & Phillips 3045 Porter Street 8th Floor Washington, D.C.
20008 1900 M Street, N.W.
Washington, D.C.
20036 Howatd L.
Blau I
217 Newbridge Road i
Mr. Marc W.
Goldsmith Hicksville, New York 11801 Energy Research Group 4001 Totten Pond Road Matthew J. Kelly, Esq.**
Waltham, Massachusetts 02154 State of New York Department of Public Service MHB. Technical Associates Three Empire State Plaza 1723 Hamilton Avenue Albany, New York 12223 Suite K San Jose, California 95125 Spence Perry, Esq.**
Associate General Counsel Mr. Jay Dunkleberger Federal Emergency Management New York State Energy Office Agency Agency Building 2 Washington, D.C.
20472 Empire State Plaza Albany, New York 12223 Edwin J.
Reis, Esq.**
U.S. Nuclear Regulatory Stewart Glass, Esq.**
Commission Regional Counsel Washington, D.C.
20555 j
Federal Emergency Management Agency 26 Federal Plaza, Room 1349 New York, New York 10278 l
kb 91 Kathy
.' B.
cc 66ke'y'
~
Hunton & Williams 707 East Main Street P.O. Box 1535 Richmond, Virginia 23212 DATED: June 7, 1983
-,. - -. _. -.. - -. _,.. ~, -. -.
. ~. -.,.
., - - - -, _. -,, --