PLA-1703, Interim Deficiency Rept Re Defective GE Hma Auxiliary Relays.Insp Program Completion Awaiting Receipt of GE Recommended Corrective Actions.Final Rept Scheduled for 830901
| ML20072J950 | |
| Person / Time | |
|---|---|
| Site: | Susquehanna |
| Issue date: | 06/09/1983 |
| From: | Curtis N PENNSYLVANIA POWER & LIGHT CO. |
| To: | Allan J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| References | |
| 10CFR-050.55E, 10CFR-50.55E, PLA-1703, NUDOCS 8307010099 | |
| Download: ML20072J950 (2) | |
Text
-
,yy PPat Pennsylvania Power & Light Company Two North Ninth Street
- Allentown, PA 18101 = 2151770L5151 54-3/9 Norman W. Curtis Vice President Engineering & Construction-Nuclear 215/770-7501 June 9, 1983 Mr. J. M. Allan Acting Regional Administrator, Region I U.S. Nuclear Regulatory Comission 631 Park Avenue King of Prussia, PA 19406 SUSQUEHANNA STEAM ELECTRIC STATION DEFECTIVE GE HMA AUXILIARY RELAYS ER 100508 FILE 821-10 PLA-1703
Reference:
PLA-1528 dated 2/18/83 N. W. Curtis to R. C. Haynes
Dear Mr. Allan:
The referenced PLA-1528 provided the Comission with an interim report of a deficiency involving GE HMA Relays in Unit II.
That report, provided under the provisions of 10CFR50.55(e), indicated that PP&L anticipated providing a final report by June 1, 1983. However, delays have been encountered in completing the inspection program and GE has not as yet provided their recomended corrective action. Therefore, the final report is currently scheduled to be submitted by September 1, 1983.
The above information was discussed in a telephone conversation on June 1, 1983, between Mr. John McCann, Sr. Resident Inspector, and Mr. Jason Saranga, PP&L.
We trust the Comission will find this request acceptable.
Very truly yours, P
-N. W. Curtis Vice President-Engineering & Construction-Nuclear JS:sab OS 7
&}
S PDR 4 q
-\\.
,.o.\\'
June 9, 1983 SSES
-PLA-1703 ER 100508 File 821-10 Mr. J. M. Allan cc Mr. Richard C. DeYoung (15)
Director-Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission Washington, D.C. 20555 1
Mr. G. Mcdonald, Director Office of Management Information & Program Control U.S. Nuclear Regulatory Commission Washington, D.C. 20555 J
Mr. John McCann.
U.S. Nuclear Regulatory Commission P.O. Box 52 Shickshinny, PA 18655 Records Center Institute of Nuclear Power Operations 1100 Circle 75 Parkway, Suite 1500 Atlanta, GE 30339 i
I
\\
l l
,