Amend 98 to License NPF-38,re Changes to TS to Add Footnote to EDG SRs Re Train AB Component Testing
ML20073B921
Person / Time
Site: Waterford Entergy icon.png
Issue date: 09/16/1994
From: Adensam E
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20073B924 List:
References
NUDOCS 9409230027
Download: ML20073B921 (5)


Text

,

  1. "'*he

~

g UNITED STATES 5"

( !

NUCLEAR REGULATORY COMMISSION i

/

WASHINGTON, D.C. 20555-0001 i

ENTERGY OPERATIONS. INC.

i DOCKET NO. 50-382 WATERFORD STEAM ELECTRIC STATION. UNIT 3 l

AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 98 License No. NPF-38 1.

The Nuclear Regulatory Commission (the Commission) has found that:

A.

The application for amendment by Entergy Operations, Inc. (the i

licensee) dated September 9, 1994, as supplemented by letters dated September 9 and September 16, 1994, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act),

and the Commission's rules and regulations set forth in 10 CFR

~!

Chapter I; i

B.

The facility will operate in conformity with'the application, the provisions of the Act, and the rules and regulations of the t

Commission; C.

There is reasonable assurance (1) that the activities authorized by-this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities'will be conducted in compliance with the Commission's regulations; D.

The issuance of this amendment'will not be inimical to the common defense and security or to the health and safety of _the public; and

.E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have l

been satisfied.

r h

l 9409230027 940916 DR ADOCK 05000302 4

PDR i

~

4.

t 2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. NPF-38 is hereby amended to read as follows:

(2) Technical Soecifications and Environmental Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendment No. 98, and the Environmental Protection Plan contained in Appendix B, are hereby incorporated in the license.

The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

i 3.

This license amendment is effective as of its date of issuance.

I FOR THE NUCLEAR REGULATORY COMMISSION t

.i Elinor G. Adensam, Assistant Director for Region IV Reactors Division of Reactor Projects - III/IV Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications

]

Date of Issuance:

September 16, 1994 1

l 1

)

i 3

i ATTACHMENT TO LICENSE AMENDMENT NO. 98 TO FACILITY OPERATING LICENSE NO. NPF-38 DOCKET NO. 50-382 1

Replace the following pages of the Appendix A Technical Specifications with the attached pages. The revised pages are identified by Amendment number and contain vertical lines indicating the areas of change.

The corresponding overleaf pages are also provided to maintain document completeness.

REMOVE PAGES INSERT PAGES 3/4 8-5 3/4 8-5 3/4 8-6 3/4 8-6

?

h k

l i

ELECTRICAL POWER SYSTEMS SURVEILLANCE RE0VIREMENTS (Continued) 3.

Verify the other properties specified in Table 1. of ASTM-D975-1977 and Regulatory Guide 1.137, Revision 1, October 1979, Position 2.a., when tested in accordance with ASTM-D975-1977; analysis shall be completed within 14 days after obtaining the sample but may be performed after the addition of new fuel oil.

Failure to meet this requirement shall nct affect diesel genera-tor OPERABILITY; however, corrective action shall be initiated within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> to return the fuel oil supply to within accept-able limits.

d.

At least once per 18 months during shutdown by:

1.

Verifying the generator capability to reject a load of greater than or equal to 498 kW (HPSI pump) while maintaining voltage at 4160 + 420,-240 volts and frequency at 60 +4.5, -1.2 Hz.

2.

Verifying the generator capability to reject a load of 4400 kW without tripping. The generator voltage shall not exceed 5023 volts during and following the load rejection.

3.

Simulating a loss-of-offsite power by itself, and:

a)

Verifying deenergization of the emergency busses and load shedding from the emergency busses.# SEE NOTE l

b)

Verifying the diesel starts on the auto-start signal, energizes the emergency busses with permanently connected loads within 10 seconds after the auto-start L

signal, energizes the auto-connected shutdown loads through the load sequencer and operates for greater than or equal to 5 minutes while its generator is loaded with the shutdown loads. After energization, the steady-state voltage and frequency of the emergency busses shall be maintained at 4160 + 420,-240 volts and 60 + 1.2, -0.3 Hz during this test.# SEE NOTE l.

4.

Verifying that on an SIAS actuation test signal (without loss-of-offsite power) the diesel generator starts on the.

auto-start signal and operates on standby for greater than-or equal to 5 minutes. The steady-state generator voltage and frequency shall be 4160 + 420,-240 volts and 60 1.2 Hz within 10 seconds after the auto-start signal; the generator voltage and frequency shall be maintained within these limits-during this test.

R l

[

t WATERFORD - UNIT 3 3/4 8-5 AMENDMENT NO. 4,23,74,00, 98