Text
142 CELAnONDE STAEET P O DOX 6008 POWER & L1G H T NEW OAL E ANS LOU'SiANA 70174-6008 9 (504)366-234S UTILIT:E3 SVSTEM L.V. MAURIN Vice President Nuclear Operations April 11 1983 W3P83-1072 Q-3-A20.02.02 3-A1.01.04 L.02 Director of Nuclear Reactor Regulation Attention: Mr. G.
Knighton, Chief Licensing Branch Nu Wer 3 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.
20555
SUBJECT:
Waterford 3 SES Docket No. 50-3033gA Generic Letter 83-01 Operator Licensing Examination Site Visit
Dear Mr. Knighton:
The purpose of this letter is to submit the Louisiana Power and Light Company (LP&L) response to the subject Generic Letter which requested an estimate of the schedule and number of operator licensing and instructor certification examinations that will be necessary between now and December 1985.
The categories into which this information has been divided will be enumerated here with the Louisiana Power and Light Company response below.
(1)
Initial (cold) license examinations for units applying for operating licenses.
Approximately 40 candidates July 11, 1983 (2)
Initial license examinations to extend licenses to a second, identical unit af ter initial licensing.
None (3)
Examinations to support certification of utility employees as instructors.
Approximately 8 candidates September, 1984 (4)
Examinations to support certification of individuals r
who are not utility employees but who are under contract to instruct licensed operators.
Approximately 3 candidates September, 1984 8304210177 830411 PDR ADOCK 05000382 V
Page l!
~
(5)
Examinations for initial licensing of personnel at operating facilities or for upgrading a license from the Reactor Operator to the Senior Operator level.
Approximately 10-12 candidates September, 1984 Approximately 10-12 candidates October, 1985 Only the Cold License (1) estimates may considered firm. The dates and numbers given above are rough estimates only and should be treated as such. Not included in these estimates is the fact that re-examinations90-120 days after the scheduled examination would be requested for any unsuccessful candidates.
We trust the above information is adequate for its intended purpose.
If you have further inquiries, please advise.
You s very truly, L.V. Maurin LVM/SMJ/ssd cc: Jim Wilson (NRC), E. L. Blake, W. M. Stevenson i
Before the UNITED STATES NUCLEAR REGULATORY COMMISSION Docket No. 50-382 In the Matter of LOUISIANA POWER & LIGHT COMPANY GENERIC LETTER 83-01 Louisiana Power & Light Company, Applicant in the above captioned proceeding, hereby files a response to Generic Letter 83-01.
Respectfully submitted, LOUISIANA POWER & LIGHT COMPANY By:
/,,,,, l L. V. Maur'in Vice President Nuclear Operation <;
DATE:
/
p
/783
STATE OF LOUISIANA)
) SS PARISH OF ORLEANS )
3 L. V. Maurin, being duly sworn, states that he is Vice President - Nuclear Operations of Louisiana Power & Light Company and that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission this report.
lhnin5 3 L. V. Maurin
~ ~ ~ ~ ~ ~ ~
SUBSCRIBED AND SWORN to typ.[ h day of9re me, a Notgry Pub]/c, in and for the Parish State above named, this /M.
/f f 3 y //
, 1983.
l A.
"NotfffP ic"
~
MY COMMISSION EXPIRES:
~
l l