1901 Ch6uteau Avenue y;
Post Ottiw Box 149 St. Louis, Mossoun 63166 31tS54 2650 DonalJ F. Schnell ELECTRIC Sersior Vice President l
nunear r
December 22, 1994 jgg
.U.S.
Nuclear Regulatory Commission Attn:
Document Control Desk i
Mail Station P1-137 Washington, D.C. 20555 Gentlemen:
ULNRC-3118 DOCKET NUMBER 50-483 CALLAWAY PLANT REVISION TO TECHNICAL SPECIFICATIONS 3/4.8.2.1, 3/4.8.2.2, 3/4.8.3.1 AND 3/4.8.3.2 ELECTRICAL POWER SYSTEMS D.C.
SOURCES AND ONSITE POWER DISTRIBUTION l
Referenco:
ULNRC-3071 dated September 9, 1994 The referenced letter transmitted an application for amendment to Facility Operating License No. NPF-30 for Callaway Plant.
The amendment request, in part, revised Specification 3.8.3.1 by relocating the requirement to maintain tie breakers between redundant busses open, to Tables 3.3-3 and 4.3-2.
The change also included, in Table 3.3-3, Action 19, an 8-hour allowed outage time when a single tie breaker between busses NG01 and NG03 or NG02 and NG04 may be closed.
The requirement for maintaining the tie breakers open is being relocated to a more appropriate section and information is being added to indicate its direct impact on the plant.
The cl6 sing of the tie breaker would cause the degraded voltage bistables setting to be incorrect.
This would cause 4 of 4 channels of one safety load group to become inoperable, thus exceeding the minimum channels needed and placing the plant in Specification 3.0.3.
However, in this case, implementation of Specification 3.0.3 is not appropriate in that one safety train is unaffected.
Also, the load shedder and sequencer is integral with the degraded voltage function.
The action statement for loss of one division of the load shedder / load eequencer is to declare the associated diesel generator
%~DR ADOCK 05000483 4 \\
eDe
~.-.
r
.c iN
'l l
-land off-site power source. inoperable and to take action j
-per Specification 3.8.1.1 or Specification 3.8.1.2.
g 1
F For.this condition, a 12-hour period is given~to
{
[
restore operable status or be in HOT STANDBY in the i
F next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and'in COLD SHUTDOWN in the next 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
-The 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> allowed in the revised Action Statement is clearly. bounded by these conditions.
The option of closing the tie breaker to maintain the affected bus energized will' enhance-the.
safe operation'of the plant in the event that the-l normal feed.is lost or degraded.
Powering equipment from the affected busses when a. tie breaker is closed i
is preferable to a forced shutdown under the provisions of Specification 3.0.3.
There is a low probability i
that voltage on the system would be low enough to affect the setpoint even with the tie breakers closed.
i The redundant train is fully operable and protected during this time period.
There is a clear safety benefit to operating under this degraded condition for-a short time rather than requiring a forced shutdown under the time constraints of Specification 3.0.3.
Closing of a tie breaker in a mode when.the busses are required to be operable, for the purpose of performing normal preventative maintenance is not the intent of this change. to this letter provides revised language to clarify this.
The basis and conclusions of the Safety' Analysis, Significant Hazard Evaluation and i
Environmental Evaluation are not affected by the information provided herewith.
If there are any questions with regard to this information please contact us.
i i
Very truly yours, Donald F. Schnell I
DES /plr
Attachment:
Technical Specification Page 3/4 3-20a.
1 1
a --
. - ~
[-
L h
STATE OF MISSOURI
)
)
. CITY OF'ST. LOUIS
)
Donald F. Schnell, of lawful age, being first duly sworn upon oath says that he-is Senior Vice President-Nuclear and an officer of Union Electric Company; that he has read the foregoing document and-knows the content thereof; that he has executed the same for and on behalf of said company with full power and authority to do so; and that the facts therein stated are true and correct to the best of his knowledge, information and belief.
/
By I
d Donald F. 'Schnell Senior Vice President Nuclear SUBSQRIBED apd sworn to before me this NN day of KTLtl+n/Lu' 1994.
/A & A Ybd/
BARBARA J. PF E NOTARY PUBLIC-STATE OF MISSOURI y( GQMMISSION EXPlRES APRIL 22.199Z SL t.ouls COUNIX f
l i
V t
-o-C cc: ' T. A.
Baxter, Esq.
Shaw, Pittman, Potts & Trowbridge 2300 N.-Street, N.W.
' Washington,1D.C.
20037 M. H. Fletcher Professional Nuclear Consulting, Inc.
-18225-A Flower Hill Way-Gaithersburg, MD 20879-5334 L. Robert Greger Chief, Reactor Project Branch 1 U.S. Nuclear Regulatcry Commission Region III B31'Warrenville Road Liole, IL 60532-4351 Bruce Bartlett Callaway Resident Office U.S. Regulatory Commission RR#1 Steedman, MO 65077 L. R. Wharton (2)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 1 White Flint, North, Mail Stop 13E21 11555 Rockville Pike l
Rockville, MD 20852-2738 Manager, Electric Department Missouri Public Service Commission P.O.
Box 360 Jefferson City, MO 65102 Ron Kucera i
Department of Natural Resources P.O.
Box 176 Jefferson City, MO 65102 i
i i
i L
i
.-