ML20080H069

From kanterella
Revision as of 22:05, 14 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Provides Supplemental Response to IE Bulletin 83-06 Re Nonconforming Matls Supplied by Tube-Line Corp.Two 4-inch Elbows in Shield Bldg Ventilation Sys Discussed in Will Be Replaced
ML20080H069
Person / Time
Site: Saint Lucie, Turkey Point, 05000000
Issue date: 01/23/1984
From: Williams J
FLORIDA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-83-06, IEB-83-6, L-84-17, NUDOCS 8402140076
Download: ML20080H069 (1)


Text

_______.______

P. O. BOX 14000, JLNO BE ACH, F L 33408 FLORIDA POWER & LIGHT COMPANY January 23, 1984 L-84-17 Mr. Janes P. O'Reilly Regional Administrator, Region II U. S. Nuclear Regulatory Commission 101 Marietta Street W Suite 2900 Atl anta, Georgi a 30303

Dear Mr. O'Reilly:

Re:

Turkey Poirt Units 3 and 4 St. Lucie Linits 1 & 2 Docket Nos. 50-250, 50-251, 50-335, 50-389 IE Bulletin 83-06 Our letter, L-83-577, dated. December 6,1983, provided our initial response to IE Bulletin 83-06 (Nonconfonning materials supplied by Tube-Line Corporation Facilities at Long Island City, New York; Houston, Texas; and Carol Strean'.

Illinois).

The purpose of this letter is to supply infonnation which was not available at the time of our initial response.

We have now received a response from the B.F. Shaw Company of Wilmington, Delaware and have found that no additional Tube-Line materials beyond those identified in our initial re-sponse were supplied to FPL.

We,have.also been notified that no additional Tube-Line materials from the period of concern.were obtained by our architect engineers or their sub-tier supplie,rs for Turkey Point Units 3 & 4 or St. Lucie Units 1 & 2.

The two four-inch elbows in the shield building ventilation systen which were discussed in our initial response will be replaced.

This completes our reponse to the action items of +'

Null eti n.

Should you or your staff hafe any questions on this information, F we contact us.

J Very truly yours, 4L M

. W. Wi l

, N.

Vice President i

Nuclear Energy Department JWW/PLP/js B402140076 840123 05000 50 Att achment f ADDCK s

~

q Mr. Jees P.;O'Reilly, Region II Qd cc:

b Jiarold F. Reise Esquire lll$

d, ;

PNS-LI-84-29

.v m.-

/

/

PEOPLE.. SERVING PEOPLE

_