05000366/LER-1978-072-03, /03L-0 on 781117:during Reactor Water Level Test & Calibr HND-2-5281,2B21-NO25A Failed to Meet Acceptance Criteria Due to Mech Failure of Instru.Caused by Binding of Pointer Shaft Inits Bushing on Low End of Scale
From kanterella
Revision as of 07:46, 14 December 2024 by StriderTol(talk | contribs)(StriderTol Bot change)