ML20082T112
| ML20082T112 | |
| Person / Time | |
|---|---|
| Site: | River Bend |
| Issue date: | 11/23/1983 |
| From: | Booker J GULF STATES UTILITIES CO. |
| To: | Jay Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| DR-134, RGB-16-422, NUDOCS 8312150161 | |
| Download: ML20082T112 (1) | |
Text
--
. f.
,ss
~
+.
p....
l GULF STATE'S UTILITIL'S COMPANY B E A U'M O N T.
TEXAS 77704 Post OFFICE BOX 2951 AREA COOE 409 838 6631 November 23, 1983 RBG-16,422 File Nos. G9.5, G9.25.1.1
=' 'T 5:.g[:
S. - q#' #~
-: c-Mr. John T. Collins, Regional Administrator IEA U. S. Nuclear Regulatory Commission U
l g\\i! g 28 883 Region IV, Office of-Inspection and Enforcement 0p 611 Ryan Plaza Drive,' Suite 1000
{J 9
~~~~~ ~- $'
Arlington, Texas 76011
Dear Mr. Collins:
River Bend Station-Unit 1 Docket No. 50-458 In+.erim Report /DR-134 Gulf States Utilities Company has not completed its investigation of DR-134 concerning'four lines located at the outlet of each residual h' eat removal system heat exchanger shell. An interim or final status report will be provided
~
by January 10, 1984.
Sincerely,
/
J. E. Booker Manager-Engineering, Nuclear Fuels & Licensing River Bend Nuclear Group P50 JEB/PJD/kt cc: Director of Inspection & Enforcement U. S. Nuclear Regulatory Commission-Washington, D. C. 20555 NRC Resident Inspector-Site
{
8312150161 831123 PDR ADOCK C5000458 a
l S
PM E
..