TXX-3592, Final Deficiency Rept Re Pipe Wall Thickness of Reactor Coolant Pressurizer Surge Line.Initially Reported on 821101. Deficiency Not Reportable Per 10CFR50.55(e)

From kanterella
Revision as of 03:19, 14 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Final Deficiency Rept Re Pipe Wall Thickness of Reactor Coolant Pressurizer Surge Line.Initially Reported on 821101. Deficiency Not Reportable Per 10CFR50.55(e)
ML20085J670
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/23/1982
From: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
10CFR-050.55E, 10CFR-50.55E, TXX-3592, NUDOCS 8310130278
Download: ML20085J670 (1)


Text

9 TEXAS UTILITIES GENERATING COMPANY 21 mil lI14Y \\N 11 m t:lt IP \\ll.\\%.11:\\ \\*4 77.20t ;N s?d #

'"b.5$'bb':::'

i November 23, 1982 TXX-3592 Mr. G. L. Madsen, Chief Reactor Project Branch 1 U. S. Nuclear Regulatory Commission Office of Inspection and Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.:

50-445 Arlington, Texas 76012 50-446 COMANCHE PEAK STEAM ELECTRIC STATION REACTOR C0OLANT PRESSURIZER SURGE LINE FILE N0.

10110

Dear Mr. Madsen:

On November 1, 1982, we verbally informed your Mr. R. G. Taylor of a discrepancy regarding the pipe wall thickness of the reacter coolant pressurizer surge line.

We have completed our investigation and concluded that the matter is not report-able under luCFR50.55(e). Records supporting this determination are available for your inspector's review at the CPSES site.

Very truly yours,

/~

R.

. Gary RJG:aq cc:

NRC REGION IV - (0 + 1 copy)

Director, Inspection & Enforcercant (15 copies)

U. S. Nuclear Regulatory Commission Washington, DC 20555 O

Y 4