TXX-4312, Deficiency Rept SDAR-147 Re Conax Penetration Connector That Came Off During Removal of Protective Endcap.Initially Reported on 840824.Evaluation Still in Progress.Next Rept Will Be Submitted by 841109

From kanterella
Revision as of 11:44, 13 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Deficiency Rept SDAR-147 Re Conax Penetration Connector That Came Off During Removal of Protective Endcap.Initially Reported on 840824.Evaluation Still in Progress.Next Rept Will Be Submitted by 841109
ML20093B261
Person / Time
Site: Comanche Peak 
Issue date: 09/24/1984
From: Clements B
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Hunter D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
SDAR-147, TXX-4312, NUDOCS 8410090500
Download: ML20093B261 (1)


Text

.

TEXAS UTILITIES GENERAflNG COMPANY NKYWAY TOWER. 400 NORTH OLIVE NTREET, L.B. At. DALLAN. TEXAN 75301

".'.'i!JOJ".'"!i September 24, 1984

,,o TXX-4312 Mr. D.R. Hunter, Chief Reactor Project Branch 2 U.S. Nuclear Regulatory Commission Office of Inspection & Enforcenent 611 Ryan Plaza Drive, Suite 1000 becket No.: 50-446 Arlington, TX 76012 Wll I

COMANCHE PEAK STEAM ELECTRIC STATION i

f SEP 2 6/984

! f CONAX PENETRATION CONNECTORS l

QA FILE: CP-84-23, SDAR-147 FILE NO.:

10110

)

Dear Mr. Hunter,

On August 24, 1984 we verbally notified your Mr. Hunnicutt of a deficiency regarding the Conax penetration connector that came off during removal of protective endcap.

We are continuing our cvaluation and anticipate completion by November 9,1984.

Very truly yours, d e $> ~

BRC/ tig cc:

FRC Region IV - (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U.S. Nuclear Regulatory Commission Washington, DC 20555 i

8410090500 840924 PDR ADOCK 05000446 i

S PDR g

j A DEYEnt0N or TEAAN l'TtLETERN ELKt*TREC COMPANT

,, - -