TXX-4293, Interim Deficiency Rept SDAR-136 Re Temp Envelope Requirements on Environ Qualification of Equipment Outside Containment or High Energy Line Breaks.Initially Reported on 840604.Westinghouse Program Developed to Address Issue
| ML20097A854 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 08/30/1984 |
| From: | Clements B TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| SDAR-136, TXX-4293, NUDOCS 8409130428 | |
| Download: ML20097A854 (1) | |
Text
TEXAS UTILITIES GENERATING COMPANY MKYWAY 78) WEN. 400 N(BMTH (pt.IVE NTNEET, L.H. Al. IDAl.LAN, TEX AN TS808 August 30, 1984
- m. -.u.. v..M.._cte..u.cu.T.
me TXX-4293 1
SM @ M OV/lS h
)
ki SEP - 4 584 ]
}[
Mr. E.H. Johnson, Chief
~
Reactor Project Branch 1 U.S. Nuclear Regulatory Connission
.0ffice of Inspection & Enforcement 611 Ryan Plaza Drive, Suite 1000 Docket Nos.:
50-445 Arlington, TX 76012 50-446 C(NANCHE PEAK STEAM ELECTRIC STATION IMPACT OF HELB TEMPERATURES ON QUALIFIED EQUIPMENT OUTSIDE CONTAlfMENT QA FILE: CP-84-12 SDAR-136 FILE N0.:
10110
Dear Mr. Johnson,
On June 4,1984 we verbally contacted your Mr. D. Hunnicutt of a deficiency regarding the temperature envelope requirements on the environmental ualification of equipment outside containment for high energy line breaks HELB). We have submitted an interim report, TXX-4212, dated July 2,1984.
As a result of industry wide application of this unreviewed safety question, the Westinghouse Owners Group has developed a program to address the issue on a generic basis. The program has been presented to the fRC and is summarized in Westinghouse letter 0G-133 which is available for your inspector's review at the CPSES Site.
The tentative schedule indicates completion in approximately twelve (12) months. We are currently reviewing the need to provide Justifications for Interim Operation (JIO) in order to preclude impacting fuel load. We will continue to monitor activities related to this issue and provide a status report by October 31, 1984.
Very truly yours.
BRC/tig cc:
fRC Region IV - (0 + 1 copy) fra7 Director, inspection & Enforcement (15 copies)
U.S. Nuclear Regulatory Commission f 0 Washington, DC 20555 g