n.--,
_..~s! C;.
.s
,e.;'
- Yayne H. Jens,
IVice Prssident 1
? Nuclear Operations
.~
~
- Fermb2 6400 North Dixie Hghway
- .i w No. port, uichigan 48iss October.17,.1984 rW I
l l <ais> sesaiso
'EF2-70027 4-
'i l.
~
~Mr.EJames G. Keppler~
~: Regional' Administrator' 4
Region.III
~
-U. S. Nuclear Regulatory Commission 1799 Roosevelt Road?
i~ Glen Ellyn, IL;60137
Dear'Mr.:
Keppler:
s.
Reference:
'(1)
Fermi 2 NRC Docket No. '50-341
~
(2)
Letter, W. H. Jens to J. G. Keppler, July.16, 1984, EF2-69287
Subject:
Interim Report.of 10CFR50.55(e) Item 129
" Lack of-Design Calculations for HVAC Duct Supports" On October 1, 1984, Detroit Edison's'Mr. J. E. Conen,.
Engineer-Licensing, telephoned Mr. R. Lerch of NRC Region III to provide additional information.regarding 10CFR50.55(e) Item 129, " Lack of Design Calculations for HVAC. Duct. Supports."
Item 129 was originally reported in Reference (2).
h Reference (2) reported that detailed design calculations.for HVAC system ductwork and supports could not be-located. -At
~
least one of the HVAC support designs examined was not rigid and,ntherefore, did not meet the rigid support assumption used in the ductwork seismic analysis.
To resolve this issue, Detroit Edison committed to reanalyze the affected safety related HVAC ductwork supports.
As part of this reanalysis, a sample of the ~HVAC supports was inspected to verify the as built drawings.
Some of the hanger attachment points were found to be noticeably off the center of the base plates.
An analysis of the impact of the off center. attachment is being performed.
The results of this analysis'will be. included in Detroit Edison's final report of Item 129.
-l 8411130477 841017 PDR ADOCK 05000341 S
PDR i
OCT 2 61984 y
/[o
.:c 4; 7
..g i.
G.'
447-
- (j.
,4 j
. j
^
f
_q
-e.
e Mr.JJames G. Kepple'r~
- Octobe r: 17,-1984 EF2-70027
.Page 21 a
Detroit Edison will provide another_ report-'on this' item, Jeither= interim or final,,when further information is'.
-available.
If you have questions concerning this matter, please. contact Mr. Lewis ' Bregni, ( 313) 586-5083.
Sincerely, j~
cc:
P.-M. Byron R. C. DeYoung R. C. Knop s
5.
....