ENS 40081
From kanterella
Revision as of 21:25, 1 March 2018 by StriderTol (talk | contribs) (Created page by program invented by StriderTol)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ENS Event | |
|---|---|
11:53 Aug 16, 2003 | |
| Title | Unit 2 Commenced a Shutdown After Entering Tech Spec 3.0.3 |
| Event Description | Both channels 1 and 3 of the FWST (Refueling Water Storage Tank) level instrumentation failed high due to an apparent lightning strike. This placed Unit 2 in Tech Spec 3.0.3 requiring Unit 2 to be in Mode 3 within 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br />, Mode 4 within 13 hours1.50463e-4 days <br />0.00361 hours <br />2.149471e-5 weeks <br />4.9465e-6 months <br />, and Mode 5 within 37 hours4.282407e-4 days <br />0.0103 hours <br />6.117725e-5 weeks <br />1.40785e-5 months <br />.
The licensee will inform the NRC resident inspector.
The licensee had its NOED approved to continue operation for up to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to repair the level channels. At 1115 the licensee halted power reduction @ 82%. They are now repairing both channels 1&3 and they should be completed within the next 3 hrs. The NRC Resident Inspector was notified. Notified Reg2 RDO (Ayres)
The licensee has completed repair of channel 1 of the level instrumentation and returned it to service @ 1357, so as of this time they have exited the action statement. Channel 3 should be returned to service within one hour. The NRC resident Inspector was informed. Notified Reg 2 RDO (Ayres) |
| Where | |
|---|---|
| Catawba South Carolina (NRC Region 2) | |
| Reporting | |
| 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
| Time - Person (Reporting Time:+2.48 h0.103 days <br />0.0148 weeks <br />0.0034 months <br />) | |
| Opened: | Tom Poetzsch 14:22 Aug 16, 2003 |
| NRC Officer: | Steve Sandin |
| Last Updated: | Aug 16, 2003 |
| 40081 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 40081\u003C/a\u003E - \u003Ca href=\"/Catawba\" title=\"Catawba\"\u003ECatawba\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EUnit 2 Commenced a Shutdown After Entering Tech Spec 3.0.3\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 40081 - Catawba\n","link":"","lat":35.05162222222222,"lon":-81.06938055555555,"icon":"/w/images/7/75/Duke_Energy_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
|---|---|
| Reactor critical | Critical |
| Scram | No |
| Before | Power Operation (100 %) |
| After | Power Operation (95 %) |
WEEKMONTHYEARENS 575172025-01-28T13:32:00028 January 2025 13:32:00
[Table view]10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown ENS 475252011-12-15T12:39:00015 December 2011 12:39:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Dual Unit Technical Specification 3.0.3 Required Shutdown Due to Loss of Control Room Chillers ENS 400812003-08-16T11:53:00016 August 2003 11:53:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Unit 2 Commenced a Shutdown After Entering Tech Spec 3.0.3 2025-01-28T13:32:00 | |
Retrieved from "https://kanterella.com/w/index.php?title=ENS_40081&oldid=429030"