ENS Event | |
---|---|
18:24 Dec 12, 2003 | |
Title | Both Trains of Component Cooling System Inoperable. |
Event Description | On 12/12/2003 , at 1224 both trains of Component Cooling System were declared inoperable. The governance by the KNPP Technical Specification (3.3.d) requires that actions commence within an hour to place the plant in Hot Standby within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, Hot Shutdown within the following 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, and to achieve the RCS Tavg less than 350 degrees F by use of alternate heat removal methods within an additional 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />. The issue stemmed from the discovery of liquid on R-17 (Component Cooling Radiation Detector) detector housing at the location of a air port. Liquid from this port was chemically tested to contain chemicals (molybdates and sulfites) currently found in the Component Cooling system. It was determined that this leak violated guidance in Generic Letter 90-05 and thus rendered both trains of component cooling inoperable due to this being in a common header. A Technical Specifications guided background has commenced at 1315 on 12/12/2003.
At the time of the call, reactor power was 84% and decreasing. All Emergency Core Cooling Systems and the Emergency Diesel Generators are fully operable if need. The electrical grid is stable. The NRC Resident Inspector was notified of this event by the licensee. |
Where | |
---|---|
Kewaunee Wisconsin (NRC Region 3) | |
Reporting | |
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
Time - Person (Reporting Time:+-3.75 h-0.156 days <br />-0.0223 weeks <br />-0.00514 months <br />) | |
Opened: | James Baptist 14:39 Dec 12, 2003 |
NRC Officer: | John Mackinnon |
Last Updated: | Dec 12, 2003 |
40391 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 40391\u003C/a\u003E - \u003Ca href=\"/Kewaunee\" title=\"Kewaunee\"\u003EKewaunee\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EBoth Trains of Component Cooling System Inoperable.\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 40391 - Kewaunee\n","link":"","lat":44.342975,"lon":-87.53713055555555,"icon":"/w/images/b/b0/Dominion_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |