ENS 42873
ENS Event | |
---|---|
20:17 Aug 8, 2006 | |
Title | 60 Day Report - Invalid Actuation of Auxiliary Feed Pump 2B |
Event Description | This 60-day report as allowed by 10 CFR 50.73 (a)(2)(iv)(A) to describe an invalid actuation of a specified system, specifically the Auxiliary Feedwater System (AFW). This event involved an invalid actuation of the Motor Driven Auxiliary Feedwater pump 2B during routine Unit 2 Auxiliary Safeguards Testing on 8/8/06. The system was properly aligned and did inject water into Steam Generators 2C and 2D as designed to perform a complete actuation of AFW pump 2B.
The motor driven auxiliary feedwater pumps will automatically start and provide the minimum required feedwater flow within one minute following any of these conditions: 1. Two out of four low-low level alarms in any one of the four steam generators. 2. Loss of both main feedwater pumps 3. Initiation of safety injection signal 4. Loss of station normal auxiliary electric power 5. AMSAC signal Since none of the five auto-start parameters were met at the time of the system actuation the signal was determined to be invalid. Engineering reviewed the CA Pump Start circuit to determine which equipment failures could cause the switchgear breaker for the AFW Pump 2B to close and start the pump. These included reviewing sequencer start signals, manual pushbuttons, and associated contacts and breakers. The failure of the fluke meter used during the testing was considered, also. In addition, the Operations Test Group performed an analysis of the human performance aspects of this testing. Based on these investigations potential equipment failures have been ruled out and based on the correspondence in time with when the inadvertent start occurred and when the meter reading was taken, it is believed that the inadvertent start is due to an anomaly with the Fluke 189 meter or issues when taking the measurement. The measurement is taken across an energized circuit, which can be susceptible to inadvertent actuations. The test procedure has been revised to open links on the circuit to prevent inadvertent operation. The licensee notified the NRC Resident Inspector. |
Where | |
---|---|
Catawba South Carolina (NRC Region 2) | |
Reporting | |
10 CFR 50.73(a)(1), Submit an LER, Invalid Actuation | |
Time - Person (Reporting Time:+1339.38 h55.808 days <br />7.972 weeks <br />1.835 months <br />) | |
Opened: | Tomas Garrison 15:40 Oct 3, 2006 |
NRC Officer: | Jason Kozal |
Last Updated: | Oct 3, 2006 |
42873 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 42873\u003C/a\u003E - \u003Ca href=\"/Catawba\" title=\"Catawba\"\u003ECatawba\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E60 Day Report - Invalid Actuation of Auxiliary Feed Pump 2B\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 42873 - Catawba\n","link":"","lat":35.05162222222222,"lon":-81.06938055555555,"icon":"/w/images/7/75/Duke_Energy_icon.png"}],"imageoverlays":null} | |
Unit 2 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |
WEEKMONTHYEARENS 491952013-05-28T17:39:00028 May 2013 17:39:00
[Table view]10 CFR 50.73(a)(1), Submit an LER 60 Day Report - Invalid Actuation of Specified System ENS 487062012-12-22T06:42:00022 December 2012 06:42:00 10 CFR 50.73(a)(1), Submit an LER 60 Day Report - Invalid Actuation of the Afw System ENS 443522008-06-09T20:31:0009 June 2008 20:31:00 10 CFR 50.73(a)(1), Submit an LER 60 Day Report - Invalid Actuation of Main Steam Isolation System ENS 440512008-01-24T07:35:00024 January 2008 07:35:00 10 CFR 50.73(a)(1), Submit an LER 60 Day Report - Invalid Actuation of the Nuclear Service Water System ENS 428732006-08-08T20:17:0008 August 2006 20:17:00 10 CFR 50.73(a)(1), Submit an LER 60 Day Report - Invalid Actuation of Auxiliary Feed Pump 2B ENS 411322004-08-22T08:50:00022 August 2004 08:50:00 10 CFR 50.73(a)(1), Submit an LER 60 Day Report - Invalid Actuation of Specified System 2013-05-28T17:39:00 | |