ML20127K182

From kanterella
Revision as of 16:08, 12 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Application for Amends to Licenses NPF-37,NPF-66,NPF-72 & NPF-77,revising TS 2.2.1,Table 2.2-1,3.3.2,Table 3.3-4 & Associated Bases,Providing Changes That Have Resulted from Setpoint Reconciliation Program
ML20127K182
Person / Time
Site: Byron, Braidwood  Constellation icon.png
Issue date: 11/23/1992
From: Simpkin T
COMMONWEALTH EDISON CO.
To: Murley T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM), Office of Nuclear Reactor Regulation
Shared Package
ML20127K185 List:
References
NUDOCS 9301260065
Download: ML20127K182 (2)


Text

_

I i

- Commenwealth Edison f

'y A 1400 opus Place

, Q)< oowners Grove, minois 60515 g

November 23,1992

\\

A i

Dr.-Thomas E. Murley, Director M

Office Of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555 3

Attn: Document Control Desk

Subject:

Byron Station Units 1 and 2 Braidwood Station Units 1 and 2 A plication for Amendment to Facility rating Licanse NPF-37, NPF 66, NPF-72, and NPF-77 t1 C_DockeiBos5014E4L455.A56_and_45Z

References:

a)

Letter from T. Simpkin to Dr. T. Murley dated April 15,1992.

Dear Dr. Murley:

With reference (a), Commonwealth Edison Company (CECO) proposed to amend Appendix A, Technical Specification for Facility Operating License NPF 37, NPF-66, N PF-72 and NPF-77. The proposed amendment involves a revision to Technical Specifications 2.2.1, Table 2.2-1,3.3.2, Table 3.3 4 and their associated bases. The proposed amendment request provides the changes that have resulted from the Setpoint Reconciliation Program.

Due to a transcription error, the revised setpoint for the Emergency Trip Header Pressure, Functional Unit 16a on page 2-5, was omitted from the Byron mark-up. Please find a corrected page 2-5 for the Byron Technical Specifications attached.

250035 e

9301260065 921323 6

DR p

ADOCK 05000454 PDR "l

I

/ sci:lD615:21

Dr. Thomas E. Murley November 23,1992 CECO is notifying the State of Illinois by transmitting a copy of this letter and its attachments to the designated State Official.

Please direct any questions regarding this matter to this office.

l Respectfully,

% % A

'~

J Terrence W. Simpkin Nuclear Licensing Administrator cc: R. Elliott, Project Manager - NRR J. Hickman, Project Manager - NRR S. DuPont, Resident inspector - Braidwood W. Kropp, Resident inspector - Byron Document Control Desk - NRR Region 111 Office Office of Nuclear Facility Safety -IDNS

/ sci:lD615:22

.