Requests Approval for Alternate Method of Meeting Section C.2.a of Rev 1 to Reg Guide 1.108 for Periodic Testing of Diesel Generator Units by Running Either 24 H Test or Running Diesel at 100% Power.Approval Requested by 850621
ML20128D628
Person / Time
Site: Clinton 
Issue date: 05/24/1985
From: Spangenberg F
ILLINOIS POWER CO.
To: Butler W
Office of Nuclear Reactor Regulation
References
RTR-REGGD-01.108, RTR-REGGD-1.108 U-600016, NUDOCS 8505290144
Download: ML20128D628 (1)


Text

.___

U-600016 L30-85(05-24)-L B52-85(05-24)-L ILLIN0/S POWER 00MPANY g

CLINTON POWER STATION P.o. BOX 678. CLINTON, ILLINOIS 61727 May 24, 1985 Docket No. 50-461 Director of Nuclear Reactor Regulation Attention:

Mr. W. R. Butler, Chief Licensing Branch No. 2 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Clinton Power Station, Unit 1 Periodic Testing of Diesel Generator Units Regulatory Guide 1.108, Revision 1

Dear Mr. Butler:

The purpose of this letter is to request approval for an alternate method of meeting the intent of Section C.2.a of Regulatory Guide 1.108.

A single test, which meets the requirements of paragraphs C.2.a.(1) and C.2.a. (2), will be performed at Clinton Power Station (CPS}." An'oth'er '

test, which meets the requirements of Paragraph C.2.a.(3), will be performed as part of a "24-Hour Load Test."

Paragraph C.2.a.(5) requires a test to be run to demonstrate functional capability et full-load temperature conditions by rerunning the test phase outlined in C.2.a. (1) and C.2.a. (2) immediately following C.2.a. (3).

Illinois Power Company proposes to meet the intent of C.2.a.(5) by running either the 24-hour test as described in C.2.a.(3) or by running the diesel at 100%

power (nominal) for a sufficient period of time to ensure that the units have reached a stabilized temperature prior to running the tests described in C.2.a. (1) and C.2.a. (2).

Illinois Power Company will initiate an FSAR change to address how CPS meets the Regulatory Guide after our position is accepted. The NRC's approval is requested by June 21, 1985. Should any further information be required, please contact us.

incerely yours, W.

W

+

F. A. Sp nge erg Director - Nucicar L censing and Configuration Nuclear Station Engineering JLP/ lab cc B. L. Siegel, NRC Clinton Licensing Project Manager NRC Resident Office Regional Administrator, Region III, USNRC Illinois Department of Nucicar Safety g)/

8505290144 050524 PDR ADOCK 05000461 h