ENS 45969
ENS Event | |
---|---|
19:50 Jun 1, 2010 | |
Title | Potential Loss of Radiation Release Controls |
Event Description | On May 27, 2010, during a control board walkdown, it was discovered that two sets of auxiliary building tunnel exhaust dampers were open at the same time. This configuration created a pathway from the secondary containment to the outside. The condition was immediately corrected. Additional investigation determined that this condition existed since May 11, 2010, when Millstone 3 was in Mode 5.
Technical Specification 3.6.6.2 'Secondary Containment' is applicable in Modes 1, 2, 3, and 4. The condition discovered on May 27, 2010, rendered Secondary Containment inoperable. Further evaluation since the discovery date concludes that the secondary containment structure was in a condition which could prevent the fulfillment of the safety function for controlling the release of radioactive material. [On June 1, at 1550 EDT the licensee determined that the event was potentially reportable]. An investigation is on-going. This condition is being reported pursuant to 10 CFR 50.72(b)(3)(v)(c). The NRC Senior Resident Inspector has been notified [by the licensee]. The State of Connecticut and the Town of Waterford were notified. A press release will be issued.
The licensee reported that no press release will be issued for this event. They will be notifying the NRC Resident Inspector. Notified R1DO (Dentel) |
Where | |
---|---|
Millstone Connecticut (NRC Region 1) | |
Reporting | |
10 CFR 50.72(b)(3)(v)(C), Loss of Safety Function - Release of Radioactive Material | |
Time - Person (Reporting Time:+-2.88 h-0.12 days <br />-0.0171 weeks <br />-0.00395 months <br />) | |
Opened: | Norman Kuzel 16:57 Jun 1, 2010 |
NRC Officer: | Vince Klco |
Last Updated: | Jun 2, 2010 |
45969 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 45969\u003C/a\u003E - \u003Ca href=\"/Millstone\" title=\"Millstone\"\u003EMillstone\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003EPotential Loss of Radiation Release Controls\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 45969 - Millstone\n","link":"","lat":41.310722222222225,"lon":-72.16767777777778,"icon":"/w/images/b/b0/Dominion_icon.png"}],"imageoverlays":null} | |
Unit 3 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (100 %) |