Title | Tech Spec Required Shutdown Due to Exceeding Allowed Outage Time on the 'A' Emergency Diesel Generator |
Event Description | (KKJ01A) 'A' Emergency Diesel Generator (EDG) was removed from service and declared inoperable [on] 11/29/2010 at 0500 (CST) for a scheduled 7 day Technical Specification equipment outage to perform various scheduled maintenance items. Technical Specification 3.8.1 Condition B was entered for one Diesel Generator inoperable, utilizing Action B.4.2.2, 'Restore the Diesel Generator to OPERABLE within 7 days AND 10 days from discovery of failure to meet LCO'.
On 12/06/2010, it was discovered during the Operability Run Surveillance, STS KJ-015A, utilized to restore the EDG to service, the Engine Analyzer Data Acquisition [software] indicated the No. 12 cylinder is 'out of balance' and will require a clearance order and maintenance repair. On 12/06/2010 [at] 0350 hrs., it was determined that the work required to restore the EDG to service would cause the Tech Spec 3.8.1 Action B.4.2.2 Completion Time requirement of 7 days to be exceeded, requiring a Plant Shutdown per TS 3.8.1 Condition H, with Action H.1, 'Be in Mode 3 within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />', and Action H.2, 'Be in Mode 5 within 36 hours4.166667e-4 days <br />0.01 hours <br />5.952381e-5 weeks <br />1.3698e-5 months <br />'. Plant Shutdown to Mode 3 was commenced [on] 12/06/2010 at 0418 (CST). The [NRC] Resident Inspector has been contacted. The licensee indicated that required repairs should be completed within 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> and expects restart to occur on 12/06/2010. |
Where | |
---|---|
Wolf Creek Kansas (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown | |
Time - Person (Reporting Time:+-4.6 h-0.192 days <br />-0.0274 weeks <br />-0.0063 months <br />) | |
Opened: | Preston Lawson 05:42 Dec 6, 2010 |
NRC Officer: | Howie Crouch |
Last Updated: | Dec 6, 2010 |
46457 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 46457\u003C/a\u003E - \u003Ca href=\"/Wolf_Creek\" title=\"Wolf Creek\"\u003EWolf Creek\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003ETech Spec Required Shutdown Due to Exceeding Allowed Outage Time on the 'A' Emergency Diesel Generator\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 46457 - Wolf Creek\n","link":"","lat":38.239158333333336,"lon":-95.68945833333333,"icon":"/w/images/4/42/Wolf_Creek_Nuclear_Operating_Corporation_icon.png"}],"imageoverlays":null} | |
Unit 1 | |
---|---|
Reactor critical | Critical |
Scram | No |
Before | Power Operation (100 %) |
After | Power Operation (85 %) |
WEEKMONTHYEARENS 572842024-08-23T13:00:00023 August 2024 13:00:00
[Table view]10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Shutdown Required by Technical Specifications ENS 545082020-02-02T00:45:0002 February 2020 00:45:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Shutdown Due to Containment Purge Valve Excessive Leakage ENS 522182016-09-02T13:08:0002 September 2016 13:08:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown ENS 510742015-05-16T02:48:00016 May 2015 02:48:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to 2 Ac Inverters Inoperable ENS 510712015-05-15T09:36:00015 May 2015 09:36:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to 2 Ac Inverters Inoperable ENS 494482013-10-18T17:11:00018 October 2013 17:11:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Loss of Cooling to Switchgear Rooms ENS 493392013-09-11T22:31:00011 September 2013 22:31:00 10 CFR 50.72(b)(3)(iv)(A), System Actuation, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Loss of Cooling to Switchgear Rooms ENS 491262013-06-17T16:11:00017 June 2013 16:11:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Non-Functional Class 1E Electrical A/C Unit ENS 490082013-05-06T22:33:0006 May 2013 22:33:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Shutdown Required Due to Non-Functional Class 1E Air Conditioning Unit ENS 479982012-06-06T08:27:0006 June 2012 08:27:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Inadequate Cooling Available to Support Electrical Power Systems ENS 471542011-08-15T15:55:00015 August 2011 15:55:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown - Contaminated Oil Sample ENS 464572010-12-06T10:18:0006 December 2010 10:18:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Tech Spec Required Shutdown Due to Exceeding Allowed Outage Time on the 'A' Emergency Diesel Generator ENS 463092010-10-05T03:00:0005 October 2010 03:00:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown ENS 461982010-08-23T13:14:00023 August 2010 13:14:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Tech Spec Required Shutdown Due to Both Edgs and an Rhr Loop Inoperable ENS 459852010-06-07T23:44:0007 June 2010 23:44:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Due to Voiding in the Component Cooling Water System ENS 456632010-01-26T21:25:00026 January 2010 21:25:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Entry Into Technical Specification Required Shutdown ENS 439852008-02-14T00:50:00014 February 2008 00:50:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification 3.0.3 Required Shutdown ENS 438952008-01-11T22:22:00011 January 2008 22:22:00 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Tech. Spec. Required Shutdown Due to Gas Voiding in Discharge Piping ENS 420042005-09-21T03:40:00021 September 2005 03:40:00 10 CFR 50.72(b)(3)(v)(B), Loss of Safety Function - Remove Residual Heat, 10 CFR 50.72(b)(2)(i), Tech Spec Required Shutdown Technical Specification Required Shutdown Commenced Due to Inoperability of Residual Heat Removal Containment Sump Isolation Valves 2024-08-23T13:00:00 | |