TAC:54670
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Request for: Open | |
| From | |
MONTHYEARAECM-84-0216, Application to Amend License NPF-13,revising Tech Specs to Change Channel Calibr Frequency from Refueling (18 Months) to Annual (366 Days) for Radiation Monitoring Instrumentation Channels1984-04-0707 April 1984
[table view]Application to Amend License NPF-13,revising Tech Specs to Change Channel Calibr Frequency from Refueling (18 Months) to Annual (366 Days) for Radiation Monitoring Instrumentation Channels ML20132C0071984-04-16016 April 1984 Forwards Evaluation of Proposed Tech Spec Changes.Changes 15,16,33 & 308 Accepted on Interim Basis.Salp Input Also Encl ML20132C0411984-04-17017 April 1984 Informs That Occurrence of Barometric Pressure Deviation from Average Pressure at Site of Greater than 0.5 Psi Extremely Unlikely.Use of 0.5 Psi in Determining Setpoints Would Encompass Range of Conditions Expected at Site 1984-04-17 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:54670&oldid=4247342"