B11791, Forwards Administrative Control Procedure ACP 6.15, Post-Trip & Transient Review, Implementing Util Nuclear Engineering & Operations Procedure Neo 8.02 W/Same Title, Per 850910 Request

From kanterella
Revision as of 19:11, 11 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Administrative Control Procedure ACP 6.15, Post-Trip & Transient Review, Implementing Util Nuclear Engineering & Operations Procedure Neo 8.02 W/Same Title, Per 850910 Request
ML20138J022
Person / Time
Site: Millstone Dominion icon.png
Issue date: 10/08/1985
From: Opeka J
NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES
To: Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML20138J026 List:
References
B11791, GL-83-28, NUDOCS 8510290220
Download: ML20138J022 (5)


Text

Y

-o N 88TILITIES o noroi Omc... seioen street, seriin. connecticut 9

rs$a

~

s-cow-P.O. BOX 270 mm **'ia ma co**

HARTFORD, CONNECTICUT 06141-0270 J C 3, C N E [co. ",

(203) 665-s000 k

k October 8,1985 Docket No. 50-423 B11791 Ihrector of Nuclear Reactor Regulation Mr. B. 3. Youngblood, Chief Licensing Branch No. I Division of Licensing U. S. Nuclear Regulatory Commission Washington, D. C. 20555

References:

(1)

W. G. Counsil letter to D. G. Eisenhut, " Millstone Nuclear Power Station, Unit Nos.1, 2 and 3, Response to Generic Letter 83-28, Generic Implications of Salem ATWS Event,"

dated November 8,1983.

(2)

B.

3.

Youngblood letter to

3. F. Opeka, " Request for Additional Information for Millstone Nuclear Power Station, Unit No. 3," dated September 10, 1985.

Dear Mr. Youngblood:

Millstone Nuclear Power Station, Unit No. 3 Response to Request for AdditionalInformation Generic Letter 83-28, Post-Trip Review In Reference (1), Northeast Nuclear Energy Company (NNECO) indicated that an operating procedure regarding the post-trip review program for Millstone Unit No. 3 would be available for NRC Staff review. In Reference (2), you requested that we provide this operating procedure so that the NRC Staff may complete its review of our program.

NNECO also indicated in Reference (1) that Millstone Nuclear Power Station Administrative Control Procedures (ACPs) 1.07, " Communications, Outside Assistance, and Response" and 6.01, " Control Room Procedure" provided guidance for post-trip recovery. The guidance provided in these procedures has been superseded by ACP 6.15, " Post-Trip and Transient Review" which implements Northeast Utilities' Nuclear Engineering and Operations Procedure NEO 8.02 of the same title. This new specific procedure ensures consistent philosophy and practices for performing post-trip review and is attached for your information and review.

A ll055

'l!

.a b'

. We are in the process of finalizing the operating procedure which will implement ACP 6.15 for Millstone Unit No. 3.

This procedure will be available for your review by October 21,1935. Please contact our licensing representative should you have any further concerns regarding this matter.

Very truly yours.

NORTHEAST NUCLEAR ENERGY COMPANY Et, al.

BY NORTHEAST NUCLEAR ENERGY COMPANY Their Agent h

F. QuL.

J. F. Opeka Senior Vice President STATE OF CONNECTICUT )

) ss. Berlin COUNTY OF HARTFORD

)

Then personally appeared before me J. F. Opeka, who being duly sworn, did state that he is Senior Vice President of Northeast Nuclear Energy Company, an Applicant herein, that he is authorized to execute and file the foregoing information in the name and on behalf of the Ap,nlicants herein and that the statements contained in said information are true and correct to the best of his knowledge and belief.

/A'lAbsN 7/n Notary Pubff My Commission Expires March 31,1988

W. D. Rombara 6-28-85 Fcrm Appr v;d by St:ticn Supzrint:ndant Effactive Data ADMINISTRATIVE CONTROL PROCEDURE COVER SHEET

)

A.

IDENTIFICATION TITLE POST TRIP AND TRANSIENT REVIEW (FE0 8.02)

NUMBER ACP 6.15 REV. 0 B.

QA REVIEW: QA/QC SUPERVISOR:

(QA RELATED ONLY)

C.

UNREVIEWED SAFETY QUESTION EVALUATION DOCUMENTATION REQUIRED:

(Significant change in procedure method or scope YES [ ]

NO [4 cs described in FSAR)

(If yes, document in 50RC meeting minutes)

D.

ENVIRONMENTAL IMPACT (Adverse environmental impact)

YES [ ]

NO [d (If yes, document in 50RC meeting minutes)

E.

INTEGRATED SAFETY REVIEW REQUIRED (Affects response of Safety Systems, performance of safety-YES [ ]

NO [e4 related control systems or performance of control systems which may indirectly affect safety system response.)

(If yes, document in 50RC meeting minutes.)

F.

SORC APPROVAL SORC MEETING NO.

NdV G.

APPROVAL AND IMPLEMENTATION THIS PROCEDURE IS HEREBY APPROVED AND EFFECTIVE ON THE DATE BELOW.

&U j'- Z e -V STATION / UNIT / STATION SERVICES SUPERINTENDENT EFFECTIVE DATE SF 311 f

Rev. 7 Page 1 of 2

  • 9,

a

^11.

REQUIRED ROUTING The following personnel are required to initial that they are aware of the provisions of the above listed document:

Station Other Admin.

Unit 1 Unit 2 Unit 3 Services Groups Superintendents

/

All Plant Personnel Exempt Personnel Department Heads Supt. Staff Engineers

/

/

/

g..h O W;u,

/

/

~

SS v

/

I.

DOCUMENT

SUMMARY

Summary:

Minor Housekeeping - title changes, typographical errors, reference changes, etc.

Change resulting from NRC regulations, bulletins, etc. (indicated I

in body of procedure per MAP 1.02).

See action / description below.

tt.

Change resulting from a Station CR (audit finding, program improvement, program expansion, etc.).

See action / description below.

Other l

See action / description below.

l Action:

l K

Personnel indicated on SF 330 read procedure as revised.

Personnel indicated on SF 330 read description below at a minimum.

(Procedure may be reviewed as time permits.)

==

Description:==

APPt f /LEcurAmmri cf Nfl0 %, o 2 Nfd 0.C P iS 5 v60 Tb l

ann C(LS369.

)

~

SF 311 Rev. 7 Page 2 of 2

P ACP 6.15 Pcge 1 R2v. O i'

i

. POST TRIP AND TRANSIENT REVIEW (NEO 8.02)

Page No.

Eff. Rev.

1-9 0

b l

i 1

1 l

l RESPONSIBLE INDIVIDUAL: UNIT 2 SUPERINIENDENT STAFF ENGINEER Title O

,+-,,,-,m.--,y