VERMONT YANKEE NUGLEAR POWER CORPORATION Ferry Road, Brattleboro, VT 05301-7002 ENGINE I OFFICE
$80 MAIN STREET BOLTON, M A D1740 (508)779 6711 February 19,1997 BVY 97-26 United States Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555
References:
(a) Ucense No. DPR-28 (Docket No. 50-271)
Subject:
1996 Annual Report of Personnel Exposure As required by Vermont Yankee Technical Specification 6.7.A.2, enclosed please find our annual report of personnel exposure. The enclosures consist of a report entitled " Reg. Guide 1.16 Man-Rem Final End of the Year Report for 1996" and a summary of any special maintenance conducted. This report covers the period beginning January 1,1996 and ending December 31,1996.
Should you have any questions with regard to this information, please contact this office.
Sincerely, VERMONT YANKEE NUCLEAR POWER CORPORATION dHw. $
James J. Duffy g400,'O Licensing engineer c: USNRC Region I Administrator USNRC Resident inspector-VYNPS USNRC Project Manager - VYNPS f
9702240440 970219 A
PDR ADOCK 05000271--
P.
V3rmont Yankse Nuclair Power Ccrp.
REG. GUIDE 1.16 MAN REM FINAL END OF THE YEAR REPORT FOR 1996 NUMBER OF PER$0NNEL DVER 100 MREM TOTAL MAN-REM
-STATION UTILITY CONTRACT WORKERS STATION UTILITY CON 1RACT WORKERS EMPLOYEES EMPLOYEES AND OTHERS EMPLOYEES EMPLOYEES AND OTHERS REACTOR OPERATIONS & SURVEILLANCE MAINTENANCE 21 0
102 5.229 0.000 34.631 OPERATIONS 25 0
1 7.978 0.000 0.304 HEALTH PHYSICS 11 0
18 3.711 0.000 4.660 SUPERVISORY 0
0 0
0.081 0.000 0.052 ENGINEERING 0
0 0
0.139 0.000 0.000 OTHER 1
0 0
0.218 0.000 0.047 SECURITY 0
0 0
0.000 0.000 0.000 ROUTINE MAINTENANCE' MAINTENANCE 21 1
371 8.586 0.101 114.502 OPE 9ATIONS 16 0
0 5.539 0.000 0.001 HEALTH PHYSICS 4
0 27 1.463 0.000 9.676
$UPERVISORY 3
0 1
0.645 0.000 0.272 ENGINEERING 1
0 1
0.194 0.000 0.407 OTHER 1
0 0
0.415 0.000 0.000 SECURITY 0
0 0
0.000 0.000 0.000 i
INSERVICE INSPECTION MAINTENANCE O
0 18 0.091 0.000 6.155 l
OPERATIONS 0
0 0
0.038 0.000 0.000 HEALTH PHYSICS 0
0 0
0.112 0.000 0.166 SUPERVISORY 0
0 0
0.000 0.000 0.000 ENGINEERING 0
0 0
0.003 0.000 0.000 OTHER 0
0 0
0.000 0.000 0.003 SECURITY 0
0 0
0.000 0.000 0.000 SPECIAL RAINTENANCE MAINTENANCE 0
0 53 0.019 0.000 22.340 OPERATIONS 0
0 0
0.000 0.000 0.000 HEALTH PHYSICS 0
0 0
0.000 0.000 0.007
$UPERVISORY 0
0 0
0.000 0.000 0.000 ENGINEERING 0
0 0
0.000 0.000 0.000 OTHER 0
0 3
0.00'0 0.000 1.520 SECURITY 0
0 0
0.000 0.000 0.000 WASTE PROCESSING MAINTENANCE O
O 0
0.068 0.000 0.428 OPERAil0NS 0
0 0
0.000 0.000 0.000 HEALTH PHYSICS 0
0 0
0.053 0.000 0.042 SUPERVISORY 0
0 0
0.006 0.000 0.000 E::GINEERING 0
0 0
0.000 0.000 0.000
'OTHER 0
0 0
0.000 0.000 0.000 SECURITY 0
0 0
0.000 0.000 0.000 RE FUELING MAINTENANCE O
O O
0.293 0.000 0.498 OPERATIONS 0
0 0
0.1[7 0.000 0.001 HEALTH PHYSICS 0
0 0
0.002 0.000 0.008 SUPERVISORY 0
0 0
0.027 0.000 0.000 ENGINEERING 0
0 0
0.112 0.000 0.000 OTHER 0
0 0
0.000 0.000 0.000 SE CURITT 0
0 0
0.000 0.000 0.000
e TOTALS MAINTENANCE 42 1
544 14.287 0.101 178.554 OPERATIONS 41 0
1 13.732 0.000 0.307 HEALTH PHYSICS 15 0
45 5.341 0.000 14.558
$UPERVISORY 3
0 1
0.759 0.000 0.324
[NGINEERING 1
0 1
0.447 0.000 0.407 OTHER 2
0 3
0.633 0.000 1.570 SECURITY 0
0 0
0.000 0.000 0.000 GRAND TOTAL 104 1
595 35.199 0.101 195.720 Approved by :
--- -- ------ - N Radiation Protection Manager Date l
i l
Special Maintenance Work
Description:
Four special maintenance projects were performed at Vermont Yankee in 1996.
Project 1: Drywell Piping Over Pressurization: This was a design change which installed pressure relief and check valves around certain valves in the drywell.
Project 2: Feedwater Heater Replacement Project: This was a complete replacement of the two feedwater heaters located inside the condensers.
Project 3: Core Shroud Tie Rod Installation Project was a design change which installed four tie rod clamps on the core shroud to prevent the shroud from coming apart due to a circumferential crack.
Project 4: Appendix J Modifications Project: This project was a design change to address weaknesses in Vermont Yankee's implementation of the Appendix J program. This design change installed 3/4" connections to be used as vents, drains, or connections for leak rate testing.