05000266/LER-1997-017, :on 920508,containment Third Door Was Blocked Open During Refueling Operations.Caused by Interpretation That Movement of Core Components Per TS Definitions Rather than Literal Wording.Routine Maintenance Procedure Revised
From kanterella
Revision as of 12:35, 11 December 2024 by StriderTol(talk | contribs)(StriderTol Bot change)