Discusses 970721 Telcon Re Arrangements for Adminstration of Licensing Exam at Facility During Week of 971117.Applicants Must Submit Preliminary Reactor Operator & Senior Reactor Operator License Application at Least 30 Days Before Exam
ML20149J960
Person / Time
Site: Calvert Cliffs  
Issue date: 07/23/1997
From: Meyer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Cruse C
BALTIMORE GAS & ELECTRIC CO.
References
NUDOCS 9707290171
Download: ML20149J960 (3)


Text

.

i

-July 23, 1997 j

p i

Mr. Charles H. Cruse Vice President - Nuclear Energy Baltimore Gas and Electric Company

' Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657 -4702 Sv8 JECT:

SENIOR REACTOR AND REACTOR INITIAL EXAMINATIONS - CALVERT CLIFFS

Dear Mr. Cruse:

In a telephone conversation on July 21,1997, between Mr. L. Briggs and Mr. R. Niedzielski, arrangements were made for the administration of licensing examinations at the Calvert Cliffs facility during the week of November 17,1997.

As agreed during the telephone conversation, your staff will prepare the examinations based on the guidelines in interim Revision 8,if NUREG-1021, " Operator Licensing Examination Standards for Power Reactors." The NRC regional office will discuss with your staff any changes that might be necessary before the examinations are administered.

to meet the above schedule, it will be necessary for your staff to furnish the examination outlines by September 19,1997. the written examinations, operating tests, and the supporting reference materials identified in Attachment 2 of ES-201 will be due by October 17,1997.- Any delay in receiving the required examination, or the submittal of inadequate or incomplete materials, may cause the examinations to be rescheduled.

In order to conduct the requested written examination and operating tests, it will be necessary for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES 302, your staff should retain the original simulator performance data (e.g., system pressures, temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be

)

in effect while the written examinations and operating tests are being administered.

To permit timely NRC review and evaluation, your staff should submit preliminary reactor operator and senior reactor operator license applications [ Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB and approval number 3150-0024), and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date. If the applications are not received at least 30 days before the examination date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the firs examination date.

$hL 9707290171'970723 lMM Nma

' * *

  • MilllllNNilllman PDR ADOCK 05000317 Illa EM P

PDR g

)

Mr. Charles H. Cruse 2

This letter contains information collections that are subject to the Paperwork Reduction Act of 1905 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30, 2000.

The public reporting burden for this collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the co!!ection of information. Send comments on any aspect of this collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by internet electronic mail at BJS1@NRC. GOV; and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, DC 20503.

The NRC may not conduct or sponsor, and a persons is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your cooperation in this matter. MR. Niedzielski has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Mr. Larry Briggs (610) 337-5366 or me at (610) 337-5211.

i Sincerely, Glenn W. Meyer, Chief Operator Licensing and Human Performance Branch Division of Reactor Safety Docket Nos. 50-317;50-318 cc:

T. Pritchett, Director, Nuclear Regulatory Matters (CCNPP) i R. McLean, Administrator, Nuclear Evaluations J. Walter, Engineering Division, Public Service Commission of Maryland K. Burger, Esquire, Maryland People's Counsel R. Ochs, Maryland Safe Energy Coalition State of Maryland (2)

R. Niedzielski, Supervisor -Initial Training Unit 1

Mr.' Charles H. Cruse 3

Distribution:

Nuclear Safety information Center (NSIC)

PUBLIC NRC Resident inspector Region i Docket Room (with concurrences)

J. Wiggins, DRS L. Briggs, DRS L. Doerflein,' DRP T. Mostak, DRP -

R. Junod, DRP W. Dean, OEDO (WMD)

S. Stewart - Calvert Cliffs

. A. Dromerick, NRR LM. Campion, RI Inspection Program Branch, NRR (IPAS)

R. Correia, NRR F. Talbot, NRR DOCDESK OL Facility File DRS Files (2) 4 DOCUMENT NAME: A: INITEXAM.CC 1

- Ta mehe a copy of this docenwat, indicate in the box: *C" = Copy without attachment / enclosure

'E' = Copy with attachment / enclosure T = No copy OFFICE Rl/DRS Rl/DRS l

Rl/

l Rl/

l Rll NAME LBriggs JM GMeyer DATE 07/23/97 074&/97 07/ /97 07/ /97 07/ /97 OFFICIAL RECORD COPY

.