ML20199D189
| ML20199D189 | |
| Person / Time | |
|---|---|
| Site: | South Texas |
| Issue date: | 01/11/1999 |
| From: | Alexion T NRC (Affiliation Not Assigned) |
| To: | Hannon J NRC (Affiliation Not Assigned) |
| References | |
| NUDOCS 9901190365 | |
| Download: ML20199D189 (4) | |
Text
'
l~
. MEMORANDUM TO: John N. Hannon, Director January 11, 1999 Project Directorate IV-1 i +.
Division of Reactor Projects lil/IV
~
Office of Nuclear Reactor Regulation -
. FROM:
- Th'omas W. Alexion, Project Manager ORIGINAL SIGNED BY:
Project Directorate IV-1 Division of Reactor Projects Ill/lV Office of Nuclear Reactor Regulation
SUBJECT:
- FORTHCOM' ING MEETING WITH STP NUCLEAR OPERATING LCOMPANY,
DATE & TIMEi
' ' Tuesday, January 26,1999 8:30 a.m. - 11:30 a.m.
' LOCATION:
U.S. Nuclear' Regulatory Commission 5
One White Flint North 11555 Rockville Pike Room O-6B11~
Rockville, Maryland PURPOSE:
The licensee desires to update the staff on their corrective actions for the
- incomplete control rod insertion anomaly and discuss the need for future L
. mid-cycle control rod drop testing. The licensee may also discuss the l.
staff's November 24,- 1998, request for additional information on the
[,
potential for irregular fuel rod bowing to occur with the new fuel design, if ka time permits.
PARTICIPANTS:*
NRC UTILITY J.Lyons K. W ork M. Chatterton D. Leazar S.Wu R.Dunn Dock'et Nos. 50-498 and 50-499 cc: See next page CONTACT:
T. Alexion, NRR 301-415-1326
-. DISTRIBUTIO.'t See next page j
- Meetings between NRC technical staff and applicants or licensees are open for interested 4
members of the public, petitioners, intervenors, or other parties to attend as observers pursuant i l
y to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister
\\
l L48340,9/20/94.
O l
L
. Document Name:MTR12699.WPD -
\\)
i OFC PM/PM- _ LA/PD4-1 PDhD4-1 g
NAME T. A e C. HaOk J.Hannon DATE J1/
/99 01/lE /99 9t4k /99 fYES\\O YEhO go 10 C:QT I [
)
COPY.
YES/NO ^
U S J i k" ' ' " '
'^
MFFICIAL RECgRP Cg' l
l 9901190365 990111
.PDR ADOCK 05000498 P.
PDR l
, l
- p nero k
UNITED STATES p
g-j NUCLEAR REGULATORY COMMISSION 2
WASHINGTON, D.C. 20666-0001 o
'+4*****
,o January 11, 1999 MEMORANDUM TO: John N. Hannon, Director Project Directorate IV-1 Division of Reactor Projects Ill/IV Office of Nuclear Reactor Regulation 1
FROM:
homas W. Alexion, Project Manager q
roject Directorate IV-1 Division of Reactor Projects lil/IV Office of Nuclear Reactor Regulation
SUBJECT:
FORTHCOMING MEETING WITH STP NUCLEAR OPERATING COMPANY DATE & TIME:
Tuesday, January 26,1999 8:30 a.m. - 11:30 a.m.
LOCATION:
U.S. Nuclear Regulatory Commission One White Flint North 11555 Rockville Pike Room O-6B11 Rockville, Maryland PURPOSE:
The licensee desires to update tho staff on their corrective actions for the incomplete control rod insertion anomaly and discuss the need for future mid-cycle control rod drop testing. The licensee may also discuss the staff's November 24,1998, request for additional information on the potential for irregular fuel rod bowing to occur with the new fuel design, if time permits.
PARTICIPANTS:*
NRC UTILITY J.Lyons K. Work l
M. Chatterton D. Leazar S.Wu R.Dunn l
Docket Nos. 50-498 and 50-499 cc: See next page CONTACT:
T. Alexion, NRR 301-415-1326
' Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Realster 48340,9/20/94.
1 Meetina Notice dated: January 11,1999 E-Mail S. Collins /R. Zimmerman (SJC1/RPZ)
. B. Boger (RPZ)
E. Adensam (EGA1)
J. Hannon (JNH) ~
T. Alexion (TWA)
C. Hawes (CMH2)
T. Martin (SLM3)
OPA J. Lyons (JEL)
M. Chatterton (MSC1)
S. Wu (SCW)
T. Gwynn, (TPG)
D. Lange (DJL)
B. Henderson (BWH)
PMNS Hard Copy
> Docket Files [
PUBLIC PD4-1 r/f
. Receptionist (OWFN and TWFN) f l-I l
l I
W
e l-
!1 STP Nuclear Operating Company South Texas, Units 1 & 2 cc:
i Mr. Cornelius F. O'Keefe Jack R. Newrnan, Esq.
l Senior Resident inspector Morgan, Lewis & Bockius U.S. Nuclear Regulatory Commission 1800 M Street, N.W.
P. O. Box 910 Washington, DC 20036-5869 Bay City, TX 77414 Mr. T. H. Cloninger A. Ramirez/C. M. Canady Vice President, Engineering & Tech Servs City of Austin STP Nuclear Operating Company
- Electric Utility Department P. O. Box 289 721 Barton Springs Road Wadsworth,TX 77483 Austin, TX 78704 Office of the Governcr Mr. M. T. Hardt ATTN: John Howard, Director Mr. W. C. Gunst Environmental and Natural City Public Service Board Resources Policy P. O. Box 1771 P. O. Box 12428 l-San Antonio,TX 78296 Austin, TX 78711 Mr. G. E. Vaughn/C. A. Johnson Jon C. Wood Central Power and Light Company Matthews & Branscomb l
P. O. Box 289 One Alamo Center Mail Code: N5012 106 S. St. Mary's Street, Suite 700 l
Wadsworth, TX 74483 San Antonio, TX 78205-3692 INPO Arthur C. Tate, Director Records Center Division of Compliance & Inspection 700 Galleria Parkway Bureau of Radiation Control Atlanta, GA 30339-3064 Texas Department of Health 1100 West 49th Street l
Regional Administrator, Region IV Austin, TX 78756 U.S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 400 Jim Calloway Arlington, TX 76011 Public Utility Commission of Texas Electric Industry Analysis D. G. Tees /R. L. Balcom P. O. Box 13326 Houston Lighting & Power Co.
Austin, TX 78711-3326 l
P. O. Box 1700 Houston,TX 77251 Mr. William T. Cottle i
President and Chief Executive Officer l
' Judge, Matagorda County STP Nuclear Operating Company.
Matagorda County Courthouse South Texas Project Electric
.1700 Seventh Street Generating Station Bay City, TX 77414 P. O. Box 289 Wadsworth, TX 77483 4
m.