ML20199H878
| ML20199H878 | |
| Person / Time | |
|---|---|
| Site: | Wolf Creek |
| Issue date: | 01/29/1998 |
| From: | Johnson W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Maynard L WOLF CREEK NUCLEAR OPERATING CORP. |
| Shared Package | |
| ML20199H882 | List: |
| References | |
| 50-482-97-23, NUDOCS 9802050141 | |
| Download: ML20199H878 (4) | |
See also: IR 05000482/1997023
Text
,
..
__-...__ _
m
_ . . . _
_ _ _
_ _
-
. - . _ _
. - .
s'
O
E'%c,I
UNITED ST ATES
-p
t
NUCLEAR REGULATORY COMMISSION
r
'
,
REoloN IV
%
~g.
611 RYAN PLAZA DRIVE, SulTE 400
- '9
0
AR LINoTON, T E XA5 760118064
9*"**#
JAN 2 9 !.098
Otto L. Maynard, President and
Chief Executive Officer
Wolf Creek Nuc! ear Operating Corporation
P.O. Box 411
Burlington, Kansas 66839
SUBJECT: NRC INSPECTION REPORT 50-482/97-23 AND NOTICE OF VIOLATION
Dear Mr. Maynard:
An NRC inspection was conducted December 14,1997, through January 24,-1998, at your Wolf
Creek Generating Station reactor facility. The enclosed report presents the scope and results of
that inspection.
- During this inspection, two cited violations of NRC requirements were identified in the areas of
operations and maintenance. Violation A indicated thht operators misunderstood the
expectations for procedure usage in that they did not wait for nuclear station operators to
complete procedure steps assigned to them, or get supervisory approval to continue, before
cnntinuing with subsequent procedure steps. Violation B resulted when technicians continued
with a surveillance test when they were not confident that they were performing the procedure
step properly, even after being questioned by the NRC inspector. They made a subsequent
error that was identified by the NRC inspector and only identified the initial error when the test
equipment ground fault interrupter tripped, deenergizing their test equipment.
1
The violations are cited in the enclosed Notice of Violation (Notice) and the circumstances
surrounding these violations are described in detail in the enclosed report. Please note that you
L are required to respond to this letter and should follow the instructions specified in the enclosed
Notice when preparing your response. The NRC will use the response, in part, to determine
whether further enforcement action is necessary to ensure compliance with regulatory
requirements.
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,its
enclosures, and your response will be placed in the NRC Public Document Room (PDR). To the
f
extent possible, your response should not include any personal privacy, proprietary, or
safeguards information so that it can be placed in the PDR without redaction.
I
4
p==AoOcx o,mo, -
-
l.ill.lL'il.l lllll lll
9
iu
em
.
.
,.
.
.
_
. ..
.
--
.-
..- .
-
.-
.
q
,
.-
Wolf Creek Nuclear Operating Corporation
-2-
Should you have any questions concerning this inspection, we will be pieased to discuss them
with you.
Sincerely,
Willia
D. Johnson, Chief
Project Branch B
Division of Reactor Projects
Docket No.: 50-482
License No.: NPF-42
Enclosures:
2. NRC Inspection Report
504 82/97-23
cc w/ enclosures:
Chief Operating Officer .
Wolf Creek Nuclear Operating Corp.
P.O. Box 411
Burlington, Kansas 66839-
Jay Silberg, Esq.
Shaw', Pittman, Potts & Trowbridge
2300 N Street, NW
Washington, D.C. 20037
Supervisor Licensing
Wolf Creek Nuclear Operating Corp.
P.O. Box 411
Burlington, Kansas 66839
-
Chief Engineer
Utilities Division
Kansas Corporation Commission
- 1500 SW Arrowhead Rd.
Topeka, Kansas 66604-4027
Office of the Governor
State of Kansas -
Topeka, Kansas 66612
,
. . = - . -
. . _ - .
. . .
_ .
.
. . .
--
-
.
< . . ..
4
.
Wolf Creek Nuclear Operating Corporation
-3-
Attorney General-
Judicial Center
- 301 S.W.10th
2nd Floor
Topeka, Kansas 66612-1597
- County Clerk
Coffey County Courthouse
- Burlington, Kansas 66839-1798
Vick L. Cooper, Chief
'
Radiation Control Program
Kansas Department of Health
and Environment
Bureau of Air and Radiation
Forbes Fie:d Building 283
Topeka, Kansas 66620
Mr. Frank Moussa
Division of Emergency Preparedness
-- 2800 SW Topeka Blvd
Topeka,Kansa. 66611-1287
-
.
.
-
-
.
-
-
. _ _ ,.
_ . . . _ .
_ . _ . _ .
- . . . . . _ _ _ . .
_ .~ .
_
.
_ . _ .
-~._
...
-
-
,
r
,s,_
Wolf Creek Nuclear' Operating Corporation -
-4-
7
JAN 2 91998
i
-
E-Mail report to T. Frye (TJF) '-
'
- E-Mail report to T. Hiltz (TGH)
E-Mail report to NRR Event Tracking System (IPAS)
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC) .'
E-Mail report to Frank Talbot (FXT)
bcc to DCD (IE01)
- bec distrib, by RIV;
l
Regional Administrator
_ Resident inspector (3)-
- DRP Director-
SRI (Callaway, RIV)
Branch Chief (DRP/B).
.
DRS-PSB -
,
Project Engineer (DRP/B)
. MIS System i
,
- Branch Chief (DRP/TSS)
RIV File
'
,
t
.
-i
!-
4 -
..
- ~
,-
,
-
,
+
o
1
DOCUMENT NAME: R:\\_WC\\WC723RP.JFR .
I
- To receive copy of document, Indicate I bobi "C" = Copy withchclosuM k;" = Copy wptfnapciosures "N
.
A
,
RIV: SRI
RIV:RI(/4o
PM: NRM IV ' C:DRP/B Lj
i
JFRingwald:sa
BASmWT4fidge
KMThordds
WDJohn96g
1/27/98
2!!^4/[g7/<(8
t' ,"O //29/#
-2/100 %4/$7
c
.
"
' OFFICIAL RECORD COPY
,
.
,
9
4
>
+
- - - - -
=
e-
v
.,-
=
.-
-
-
,,<e
.
_ - .
.
- - _
..
-.
. ~ .
-
.
y
-4
- Wolf Creek Nuclear Operating Corporation
-4-
'
JAN 2 91998
E Mail report to T. Frye (TJF) -
E-Mail report to T. Hiltz (TGH)
E-Mai! report to NRR Event Tracking System (IPAS)
-
E-Mail report to Document Control Desk (DOCDESK)
E-Mail report to Richard Correia (RPC) -
E Mail report to Frank Talbot (FXT)
4 boc to DCD (IE01);"-
bec distrib. by RIV:
Regional Administrator
Resident inspector (3)
DRP Director
SRI (Callaway, RIV)
Branch Chief (DRP/B)
DRS-PSB
Project Engineer (DRP/B)
MIS System
Branch Chief (DRPRSS)
RIV File
05002G
1
DOCUMENT NAME: R:\\ WC\\WC723RP.JFR
I
To recole copy of document. Indicate I bog: "C" = Copy wrthoM nclosud k;" = Copy wptWhpelosures "N" = No copy
A
RIV: SRI
RIV:RI(/M
PM:NRQ E C:DRP/B L-j
JFRingwald:sa
BASm#d/idge
KMThorffs
WDJohnp6/
1127198
2ll^G'I{aq/G H I/29{$
W-F)6l/$9/48
' OFFICIAL RECORD COPY