{{#Wiki_filter:- t p net:oqk l p UNITED STATES g j NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. enmaa anni %...../ ENTERGY GULF STATES. INC. ** ANR ENTERGY OPERATIONS. INC. DOCKET NO. 50-458 RIVER BEND STATION. UNIT 1 AMENDMENT TO FAOILITY OPERATING LICENSE Amendment No.102 License No. NPF-47 1. The Nuclear Regulatory Commission (the Commission) has found that: A. The apolication for amendment by Entergy Gulf States, Inc.* (the licensee) dated September 22,1998, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; B. The facility will cporate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C. There is reasonable assurance: (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D. The issuance of this license amendment will not be inimical to the common defense and security or to the health and safety of the public; and E. The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
- 201 is authorized to act as agent for Entergy Gulf States, Inc, and has exclusive resporisibility and control over the physical construction, operation and maintenance of the facility.
- Entergy Gu!f States, Inc., has merged with a wholly owned subsidiary of Entergy Corporation.
Eiitergy Gulf States, inc. was the surviving company in the merger. 4 9902010224 990127 PDR ADOCK 05000450 P pg
I a 1 2. Accordingly, the license is amended by deleting Paragraph 2.C.(8) and Attachment 3 to the license conditions as indicated in the attachment to this license amendment of Facility Operating License No. NPF-47. 3. The license amendment is effective as of its date of issuance. I FOR THE NUCLEAR REGULATOF., COMMISSION 19 obert J. Fretz, Proje nager Project Directorate iV-1 Division of Reactor Projects lil/lV Office of Nuclear Reactor Regulation
Attachment:
Changes to Facility Operating License NPF-47 Date of issuance: January 27, 1999 i 4 m
t l ATTACHMENT TO LICENSE AMENDMENT NO.102 FACILITY OPERATING LICENSE NO. NPF-47 l DOCKET NO. 50-458 i l Replace the following pages of the license conditions with the attached page and remove to Facility Operating License No. NPF-47. The revised pages are identified by Amendment number and contain marginal lines indicating the areas of change. REMOVE INSERT l 5 5 j I i O l m -*r -n---e-w-n
l (7) Bvoassed and Inocerable Status Indication (Section 7.5.2.2. SER and SSER 31 Prior to startup following the first refueling outage, GSU shall implement design modifications to improve the capabilities of existing bypassed and inoperable status indication used to monitor the status of safety related systems. The specific design changes to be implemented are identified in a GSU letter dated December 3,1984 as clarified in a GSU letter dated March 5,1985. (8) DELETED 1 (9) Ultimate Heat Sink (Section 9.2.5. SER and SSER 3) Prior to startup following the first refueling outage GSU shall have installed and operational in the ultimate heat sink a permanent temperature monitoring system acceptable to the NRC staff and Technical Specification modifications at required. (10) Fire Protection (Section 9.5.1. SER and SSER 3) EOl shall comply with the requirements of the fire protection program as specified in Attachment 4. Attachment 4 is hereby incorporated into this license. (11) Ooeratina Staff Exoerience Reauirements (Section 13.1.2.1. SSER 2 I EOl shall have a licensed senior operator on each shift, while in Operating Condition 1,2 and 3, who has had at least six months of hot operating experience on a plant comparable to River Bend Station, including at least six weeks at power levels greater than 20% of full power, and who has had startup and shutdown experience. (12) Post-Fuel-Loadina Initial Test Proaram (Section 14. SER and SSER 3) Any changes to the initial test progmm described in Section 14 of the FSAR made in accordance with the prrvisions of 10 CFR 50.59 shall be reported in accordance with 50.59(b) withh one month of such change. Amendment No. 90;79,102 I e - ee*w e m aos e.. wee. ++ =}}