Ack Receipt of NRC Form 241,dtd 990204 & Application Fee in Listed Amount,Submitted to Rept Proposed Activities in NRC Jurisdiction Under Authority of General License,Per 10CFR150.20
ML20203H018
Person / Time
Issue date: 02/17/1999
From: Pearson M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Buhr S
STANDARD NUCLEAR CONSULTANTS, LTD.
Shared Package
ML20203H021 List:
References
SSD, NUDOCS 9902220160
Download: ML20203H018 (2)


Text

l i

February 17,1999 i

Stan W. Buhr Standard Nuclear Consultants 1 So. 016 Donny Hill Road Elburn, IL 60119

Dear Mr. Buhr:

This acknowledges receipt of your NRC Form 241 dated February 4,1999, and the $1,100.00 application fee, which you submitted to report proposed activities in NRC jurisdiction under the authority of the generallicense pursuant to 10 CFR 150.20. Your Agreement State License No. IL-01300-01 is recognized as valid for the proposed use of licensed material as described in this initial application not to exceed 180 days in calendar year 1999.

As a reminder, NRC Form 241's should be submitted at least three days prior to start of any work activities in Non-Agreement States. When it becomes necessary, as in the case of this current application, a verbal request for a waiver of the reporting requirements, and granting of such a waiver, is necessary prior to the conduct of any work in NRC Jurisdiction. This was explained to you during our phone conversation on February 10,1999, and shou!d be adhered to in future submittals.

Please refer to Page 4 of 10 of the attachment to your application where "NIPSCO"is listed as a work location with no associated address and a work date of 4/29/99. Complete work location information must be submitted to us prior to start of yourwork activities on April 29, 1999, or prior to any rescheduled work date, whichever occurs first.

Deletion of specific work locations or work sites, work site contacts, addition and/or deletion of dates of work, or changes in the equipment to be used when there is no change in the activity to be conducted or the radioactive material to be used are considered clarifications and as such, do not require a fee. However, a $200 fee is required whenever you revise the initial NRC Form 241 to include additionallocations of work; when you propose to use different radioactive materials; or you plan to perform additional work activities not previously approved by NRC.

When submitting clarifications of proposed dates and locations of work, please include the Location Reference Number assigned to a particular work location. This information can be found on the approved NRC Form 241, attached.

Please provide us a copy of your renewed Illinois license when received.

f

)

{

//[0&h 9902220160 990217 PDR RC SSD ppg

Stan W. Buhr We appreciate your cooperation. ' Should you have questions concerning this letter or other l

aspects of working in NRC jurisdiction under reciprocity, please contact me at 630/829-9840.

l Sincerely, l

Marcia J. Pearson Nuclear Materials Program Assistant L

Attachment:

As stated I

cc w/ attachment:

Region 1 3

Region 11 l

I I

8 l

1 to receive a copy of this escoent, tndicate in tw has 'c' = coy vtthout attacWenel T = toy with ettach/enct *r = no coy 0FFICE RIII M NAME PE P

DATE 02 99 0FFICIAL RECORD COPY e

i i

I l

l

)

.I