TXX-4913, Interim Deficiency Rept CP-86-21 Re Discrepancies in Methodology for Testing Environ Qualification of Raychem Kit NPKS-02-01.Initially Reported on 860324.Evaluation Continuing.Next Rept Will Be Submitted by 860829

From kanterella
Revision as of 21:46, 6 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-21 Re Discrepancies in Methodology for Testing Environ Qualification of Raychem Kit NPKS-02-01.Initially Reported on 860324.Evaluation Continuing.Next Rept Will Be Submitted by 860829
ML20207K938
Person / Time
Site: Comanche Peak  
Issue date: 07/16/1986
From: Counsil W, Keeley G
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-21, TXX-4913, NUDOCS 8607300134
Download: ML20207K938 (1)


Text

Log # TXX-4913 File # 10110 903.11 TEXAS UTILITIES GENERATING COMPANY fiKYWAY TOWER = 400 NORTH OLIVE ST3tEET. I.fl. 9 5. DALt.AS. TEX AN 78201 July 16,1986 h [-s$(d[50h}

  • ~

y w: :-

Mr. Eric H. Johnson, Director I /l Division of Reactor Safety and Projects f'

ML 2 l b &{

U. S. Nuclear Regulatory Commission i

L 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 QUALIFICATION OF RAYCHEM KIT NPKS-02-01 SDAR: CP-86-21 (INTERIM REPORT)

Dear Mr. Johnson:

On March 24, 1986, we verbally notified your Mr. T. F. Westerman of a deficiency involving possible discrepancies in vendor (Raychem) methodology for testing of environmental qualification which may render the Raychem Kit NPKS-02-01 unacceptable for specific published applications. This is an interim report of a potentially reportable item under the provision of 10CFR50.55(e). We have submitted interim reports logged TXX-4772 and TXX-4830, dated April 23, 1986, and May 28, 1986, respectively.

We are continuing our evaluation and anticipate submitting our next report by August 29, 1986.

Very truly yours, W. G. Co n il By:

i/

G. S. Keelqy

~

/

Manager,Nucleargicensing JCH/arh c - NRC Region IV (0 + 1 Copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 8607300134 860716 DR ADOCK 0500 5

l l

A DEVISION OF TEXAS UTillTIES ELECTNBC COMPANY

& 76(p XE27