ML20217G950

From kanterella
Revision as of 08:37, 3 December 2024 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Discusses Rev 4M of Byron Nuclear Power Station Annex Emergency Plan,Received in Dec 1997.NRC Approval Not Required Based on Determination That Changes Do Not Decrease Effectiveness of Emergency Plan
ML20217G950
Person / Time
Site: Byron  
Issue date: 03/30/1998
From: Creed J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kingsley O
COMMONWEALTH EDISON CO.
References
NUDOCS 9804030114
Download: ML20217G950 (2)


Text

  • 9,.-

g March 30, 1998 Mr. Oliver D. Kingsley.

President, Nuclear Generation Group Commonwealth Edison Company ATTN: Regulatory Services Executive Towers West lil t

1400 Opus Place, Suite 500 Downers Grove, IL 60515

SUBJECT:

REVIEW OF REVISION 4M TO THE BYRON NUCLEAR POWER STATION'S ANNEX TO THE GENERATING STATIONS EMERGENCY PLAN

Dear Mr. Kingsley:

In December 1997, Region til received Revision 4M to the Byron Nuclear Power Station's

- Annex to the Generating Stations Emergency Plan. This revision was submitted under the provisions of 10 CFR 50.54(q).

Based on your determinations that the changes in Revision 4M do not decrease the effectiveness of your Emergency Plan, and that it continues to meet the standards of 10 CFR

- 50.47(b) and the requirements of Appendix E to Part 50, NRC approvalis not required. Our initial review of these changes indicates the_m to be in accordance with 10 CFR 50.54(q).

Implementation of these changes will be subject to inspection to confirm that they have not decreased the effectiveness of your Emergency Plan.

In accordance with 10 CFR 2.790 of the Commission's Regulations, a copy of this letter will be placed in the NRC Public Document Room.

t Sincerely, original signed by T..Ploski James R. Creed, Chief Plant Support Branch 1 Docket No. 50-454; 50-455.

See Attached Distnbution DOCUMENT NAME: G:DRS\\ BYRON 4M.LTR

- To receive a ce py of this document, indicate in the box *C" = Copy w/o attach /enci *E's Co >y w/sttach/enci "N" = No copy OFFICE Rill:DRS 6

Rlli:DRS f/

Rill:DRS

,(/

NAME Ploski/lc7 Foster rJf)L Creed #h DATE 3/Ja98 3/$98 -

3/p08 F'

S

>6,

C)

OFFICIAL RECORD COPY 2

6 p*oBaaMe8ji.

W g

O. Kingsley 2

cc:

M. Wallace, Senior Vice President D. Helwig, Senior Vice President G. Stanley, PWR Vice President J. Perry, BWR Vice President D. Farrar, Regulatory Services Manager

1. Johnson, Licensing Director DCD - Licensing K. Graesser, Site Vice President K. Kofron, Station Manager D. Brindle, Regulatory Assurance Supervisor Richard Hubbard Nathan Schloss, Economist

' Office of the Attomey General State Liaison Officer State Liaison Officer, Wisconsin Chairman, Illinois Commerce Commission W. Curtis, FEMA, Region V Distribution:

Docket File DRP PUBLIC IE-01 TSS A. Beach.

DRS (2)

Deputy RA _

RlllPRR Rlli Enf. Coord.

RAC1 (E-Mail)

SRI Byron IEO (E-Mail)

Project Mgr., NRR DOCDESK (E-Mail)

GREENS D. Gonzalez, Rlli

-